<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE article
  PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.1 20151215//EN" "https://jats.nlm.nih.gov/publishing/1.1/JATS-journalpublishing1.dtd">
<article article-type="research-article" dtd-version="1.1" specific-use="sps-1.7" xml:lang="en" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">
	<front>
		<journal-meta>
			<journal-id journal-id-type="publisher-id">dyna</journal-id>
			<journal-title-group>
				<journal-title>DYNA</journal-title>
				<abbrev-journal-title abbrev-type="publisher">Dyna rev.fac.nac.minas</abbrev-journal-title>
			</journal-title-group>
			<issn pub-type="ppub">0012-7353</issn>
			<publisher>
				<publisher-name>Universidad Nacional de Colombia</publisher-name>
			</publisher>
		</journal-meta>
		<article-meta>
			<article-id pub-id-type="doi">10.15446/dyna.v85n207.71658</article-id>
			<article-categories>
				<subj-group subj-group-type="heading">
					<subject>Artículos</subject>
				</subj-group>
			</article-categories>
			<title-group>
				<article-title>Analysis of the efficacy of operational availability equations on series and parallel systems</article-title>
				<trans-title-group xml:lang="es">
					<trans-title>Análisis de la eficacia de las ecuaciones de la disponibilidad operacional de sistemas en serie y paralelo</trans-title>
				</trans-title-group>
			</title-group>
			<contrib-group>
				<contrib contrib-type="author">
					<name>
						<surname>Hernández-Dávila</surname>
						<given-names>Eduardo Segundo</given-names>
					</name>
					<xref ref-type="aff" rid="aff1"><sup>a</sup></xref>
				</contrib>
				<contrib contrib-type="author">
					<name>
						<surname>Granizo</surname>
						<given-names>José Antonio</given-names>
					</name>
					<xref ref-type="aff" rid="aff1"><sup>a</sup></xref>
				</contrib>
				<contrib contrib-type="author">
					<name>
						<surname>Santillán-Gallegos</surname>
						<given-names>Marco</given-names>
					</name>
					<xref ref-type="aff" rid="aff1"><sup>a</sup></xref>
				</contrib>
				<contrib contrib-type="author">
					<name>
						<surname>Haro-Medina</surname>
						<given-names>Marco</given-names>
					</name>
					<xref ref-type="aff" rid="aff1"><sup>a</sup></xref>
				</contrib>
				<aff id="aff1">
					<label>a</label>
					<institution content-type="original"> Escuela Superior Politécnica de Chimborazo, Riobamba, Ecuador. edhernandez@espoch.edu.ec, jagranizo@espoch.edu.ec, marco.santillan@espoch.edu.ec, marco.haro@espoch.edu.ec</institution>
					<institution content-type="normalized">Escuela Superior Politécnica de Chimborazo</institution>
					<institution content-type="orgname">Escuela Superior Politécnica de Chimborazo</institution>
					<addr-line>
						<city>Riobamba</city>
					</addr-line>
					<country country="EC">Ecuador</country>
					<email>edhernandez@espoch.edu.ec</email>
					<email>jagranizo@espoch.edu.ec</email>
					<email>marco.santillan@espoch.edu.ec</email>
					<email>marco.haro@espoch.edu.ec</email>
				</aff>
			</contrib-group>
			<pub-date pub-type="epub-ppub">
				<season>Oct-Dec</season>
				<year>2018</year>
			</pub-date>
			<volume>85</volume>
			<issue>207</issue>
			<fpage>269</fpage>
			<lpage>277</lpage>
			<history>
				<date date-type="received">
					<day>11</day>
					<month>04</month>
					<year>2018</year>
				</date>
				<date date-type="rev-recd">
					<day>31</day>
					<month>08</month>
					<year>2018</year>
				</date>
				<date date-type="accepted">
					<day>28</day>
					<month>11</month>
					<year>2018</year>
				</date>
			</history>
			<permissions>
				<license license-type="open-access" xlink:href="https://creativecommons.org/licenses/by-nc-nd/4.0/" xml:lang="en">
					<license-p>This is an open-access article distributed under the terms of the Creative Commons Attribution License</license-p>
				</license>
			</permissions>
			<abstract>
				<title>Abstract</title>
				<p>The errors of calculation of the availability may bring as a consequence mistakes in the decision making in operational systems management. For this reason, the objective of this paper is to evaluate the efficacy of the current equations for the calculation of the availability of series and parallel systems. For that purpose, the non-manufactured production calculated by these equations was compared with the real non-manufactured production which is a function of the down time of each component. These calculations constituted the deterministic model used in the simulations through Monte Carlo method, for which the statistical software R was used. The results were evaluated by the Kolmogorov Smirnov normality test with the modification of Lilliefors. The comparison of means to evaluate the efficacy of the current equations were performed using the t statistic; for this the data were previously approximated to the normal distribution by the central limit theorem.</p>
			</abstract>
			<trans-abstract xml:lang="es">
				<title>Resumen</title>
				<p>Los errores de cálculo de la disponibilidad pueden traer como consecuencia equivocaciones en la toma de decisiones en la gestión de sistemas operacionales. Por tal motivo el objetivo del presente trabajo es evaluar la eficacia de las ecuaciones vigentes para el cálculo de la disponibilidad de sistemas en serie y paralelo, comparando la producción no fabricada calculada mediante estas ecuaciones con la producción no fabricada real en función del tiempo de indisponibilidad de cada componente. Estos cálculos constituyeron el modelo determinista utilizado en las simulaciones mediante el método Monte Carlo que se ejecutaron empleado el software estadístico R. Los resultados fueron evaluados con el test de normalidad de Kolmogorov Smirnov con la modificación de Lilliefors. La comparación de medias para evaluar la eficacia de las ecuaciones vigentes se realizó utilizando el estadístico t; para esto previamente se aproximó los datos a la distribución normal mediante el teorema de límite central.</p>
			</trans-abstract>
			<kwd-group xml:lang="en">
				<title><bold>
 <italic>Keywords</italic>:</bold></title>
				<kwd>availability</kwd>
				<kwd>down time</kwd>
				<kwd>series systems</kwd>
				<kwd>parallel systems</kwd>
				<kwd>non-manufactured products</kwd>
			</kwd-group>
			<kwd-group xml:lang="es">
				<title><bold>
 <italic>Palabras clave</italic>:</bold></title>
				<kwd>disponibilidad</kwd>
				<kwd>tiempo de indisponibilidad</kwd>
				<kwd>sistemas en serie</kwd>
				<kwd>sistemas en paralelo</kwd>
				<kwd>productos no fabricados</kwd>
			</kwd-group>
			<counts>
				<fig-count count="9"/>
				<table-count count="9"/>
				<equation-count count="12"/>
				<ref-count count="19"/>
				<page-count count="9"/>
			</counts>
		</article-meta>
	</front>
	<body>
		<sec sec-type="intro">
			<title>1. Introduction</title>
			<p>From the beginning of the study of the probability of repairable component failures, until now, operational availability is considered as the capacity of a component to fulfill its function when required [<xref ref-type="bibr" rid="B1">1</xref>-<xref ref-type="bibr" rid="B4">4</xref>]. This indicator originated because operational systems cannot guarantee 100% of the continuous flow of their operation, due to interruptions that occur as a result of the occurrence of unforeseen failures or the execution of preventive maintenance activities; therefore, they cannot fulfill their function during all the required time.</p>
			<p>For this reason, availability is one of the most important indicators for decision making within operational and maintenance management [<xref ref-type="bibr" rid="B3">3</xref>,<xref ref-type="bibr" rid="B5">5</xref>], frequently used in the planning of the operation of productive and services systems.</p>
			<p>Depending of system operational capacity, a small variation in availability represent very important variations in the operational consequences. For example, commonly in production systems, a small decrease in availability represents a considerable reduction in production [<xref ref-type="bibr" rid="B6">6</xref>]. So, the calculation of availability must have a high degree of accuracy.</p>
			<p>The problem is that the calculation of the availability of a single component that is done by dividing the real operating time for the desired operating time [<xref ref-type="bibr" rid="B1">1</xref>,<xref ref-type="bibr" rid="B4">4</xref>] is consistent; but for series and parallel systems, the current calculation method [<xref ref-type="bibr" rid="B7">7</xref>-<xref ref-type="bibr" rid="B9">9</xref>] is analogous to that of reliability [<xref ref-type="bibr" rid="B10">10</xref>]; even though the availability and reliability are totally different.</p>
			<p>Reliability is a purely stochastic process, which indicates the probability of satisfactory operation [<xref ref-type="bibr" rid="B3">3</xref>,<xref ref-type="bibr" rid="B11">11</xref>], whose value starts in one after the start-up or immediately after the repair and tends to zero when time tends to infinity; while, at the time the fault occurs and while it lasts, it takes the value of zero.</p>
			<p>On the other hand, the operational availability is eminently deterministic, whose value in conjunction with other indicators measures the performance of the component during the analyzed time period; therefore, it expresses the result of events that occurred, and that for no reason is probabilistic. For this reason, the current equations for the calculation of the availability on series and parallel systems are questionable; however, these equations are widely used both in scientific research [<xref ref-type="bibr" rid="B12">12</xref>-<xref ref-type="bibr" rid="B14">14</xref>] and in the production of books [<xref ref-type="bibr" rid="B15">15</xref>,<xref ref-type="bibr" rid="B16">16</xref>].</p>
			<p>The objective of this research is to evaluate these equations by analyzing the quantity of products that the system stops manufacturing due to the unavailability of each of its components, in order to know its level of precision and its calculation error. In order to do so, three operational models have been designed with two components each of equal operational capacity; set up in series, active parallel and passive parallel, respectively.</p>
			<p>The results are obtained through the iteration of 5000 samples of size 250 with the Monte Carlo method, where a range of values of the down times of each component are entered randomly, in the current equations of the availability on series and parallel systems, to later evaluate its effectiveness, comparing these results with the t statistic.</p>
		</sec>
		<sec sec-type="methods">
			<title>2. Methodology</title>
			<sec>
				<title><italic>2.1. Foundations</italic></title>
				<p>With the purpose of using standard nomenclature and to have a better understanding of the relationship between the times used for the calculation of availability, an adaptation of the scheme of the &quot;states of an item&quot; of the EN 13306:2010 standard was made [<xref ref-type="bibr" rid="B17">17</xref>] in terms of the relative times to availability, obtaining the simplified scheme of <xref ref-type="fig" rid="f1">Fig. 1</xref>.</p>
				<p>
					<fig id="f1">
						<label>Figure 1</label>
						<caption>
							<title>Relative times to availability.</title>
						</caption>
						<graphic xlink:href="0012-7353-dyna-85-207-269-gf1.jpg"/>
						<attrib><bold>Source:</bold> Adapted from [<xref ref-type="bibr" rid="B17">17</xref>].</attrib>
					</fig>
				</p>
				<p>For the calculation of the individual availability of each component, <xref ref-type="disp-formula" rid="e1">eq. (1)</xref> corresponding to technical indicator T2 provided in standard EN 15341:2007 [<xref ref-type="bibr" rid="B18">18</xref>]. In terms of <xref ref-type="fig" rid="f1">Fig. 1</xref>, this indicator is expressed as follows:</p>
				<p>
					<disp-formula id="e1">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e1.png"/>
					</disp-formula>
				</p>
				<p>Where <italic>A</italic> is availability, <italic>UT</italic> is up time obtained during the required time, DT is down time obtained during the required time and RT is the required time.</p>
				<p>The amount of production reached on production system depends on the intrinsic operating capacity of a certain production process under certain operating conditions and the total effective time in which that process works without failure. This is reflected with the following equation:</p>
				<p>
					<disp-formula id="e2">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e2.png"/>
					</disp-formula>
				</p>
				<p>Where Q is the production reached and C is the operational capacity expressed in items produced by time unit.</p>
				<p>On the other hand, the production not manufactured as a consequence of the down time (<inline-graphic xlink:href="0012-7353-dyna-85-207-269-i005.png"/>) is calculated with:</p>
				<p>
					<disp-formula id="e3">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e3.png"/>
					</disp-formula>
				</p>
				<p>To express <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i005.png"/> in terms of availability, <xref ref-type="disp-formula" rid="e1">eq. (1)</xref> was replaced in <xref ref-type="disp-formula" rid="e3">eq. (3)</xref>, having as a result:</p>
				<p>
					<disp-formula id="e4">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e4.png"/>
					</disp-formula>
				</p>
				<p>Note that the production reached plus the non-manufactured production as a consequence of the down time is the installed capacity (Q<sub>0</sub>).</p>
			</sec>
			<sec>
				<title><italic>2.2. Models of the systems</italic></title>
				<p>The model of series system was delimited with two components as illustrated in <xref ref-type="fig" rid="f2">Fig. 2</xref>. This model is characterized in that any functional failure of one of its components causes the failure of the entire system [<xref ref-type="bibr" rid="B5">5</xref>,<xref ref-type="bibr" rid="B15">15</xref>]. Therefore, if component 1 is in a fault state, the system will not be able to operate, remaining in a down state, while component 2 remains in the stand by state. Analogously, if component 2 is in a fault state, the system will not be able to operate either, at which time component 1 will be in the stand by state.</p>
				<p>
					<fig id="f2">
						<label>Figure 2</label>
						<caption>
							<title>Series system.</title>
						</caption>
						<graphic xlink:href="0012-7353-dyna-85-207-269-gf2.jpg"/>
						<attrib><bold>Source:</bold> The authors.</attrib>
					</fig>
				</p>
				<p>It should be noted that the component that is in the stand by state cannot fail because it is not operating; therefore, the total sum of the down times of each component, in no case can be greater than the required time, otherwise the <xref ref-type="disp-formula" rid="e1">equation (1)</xref> and those that are deducted from it, would give negative values, which is unreal.</p>
				<p>In the model of the active parallel system indicated in <xref ref-type="fig" rid="f3">Fig. 3</xref>, the two components operate simultaneously and with the same operating capacity, although in reality their capacities may be different. This model is characterized in that the functional failure of one of its components causes the decrease in the capacity of the system by half; therefore, the parallel system is in a down state only if the two components fail at the same time [<xref ref-type="bibr" rid="B5">5</xref>,<xref ref-type="bibr" rid="B15">15</xref>].</p>
				<p>
					<fig id="f3">
						<label>Figure 3</label>
						<caption>
							<title>Parallel system.</title>
						</caption>
						<graphic xlink:href="0012-7353-dyna-85-207-269-gf3.jpg"/>
						<attrib><bold>Source:</bold> The authors.</attrib>
					</fig>
				</p>
				<p>The model of passive parallel system was also represented with the two components of <xref ref-type="fig" rid="f3">Fig. 3</xref>. This model is characterized by when component 1 fails, component 2 comes into operation, which is the one configured in passive parallel; Thus; as long as the two components do not fail at the same time, the system will continue to operate [<xref ref-type="bibr" rid="B15">15</xref>]. In this model the two components also have the same operational capacity.</p>
			</sec>
			<sec>
				<title><italic>2.3. Deterministic model</italic></title>
				<p>The deterministic model for the simulation using the Monte Carlo method was based on the current equations for calculating the availability of series and parallel systems, in order to determine the non-manufactured production as a consequence of the down time (<xref ref-type="disp-formula" rid="e4">eq. 4</xref>); and with the real reached production calculated with <xref ref-type="disp-formula" rid="e3">eq. (3)</xref>. For which, the current equation for calculation of the availability on series systems is the following [<xref ref-type="bibr" rid="B8">8</xref>]:</p>
				<p>
					<disp-formula id="e5">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e5.png"/>
					</disp-formula>
				</p>
				<p>Where A<sub>s</sub> is the availability on series system, A<sub>csi</sub> is the availability of i th series component, DT<sub>sci</sub> is the down time of 𝑖th series component and n is the total number of series components.</p>
				<p>The non-manufactured production as down time consequence of series systems was obtained by replacing the <xref ref-type="disp-formula" rid="e5">eq. (5)</xref> in <xref ref-type="disp-formula" rid="e4">eq. (4)</xref>:</p>
				<p>
					<disp-formula id="e6">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e6.png"/>
					</disp-formula>
				</p>
				<p>Where <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i013.png"/> is the non-manufactured production as down time consequence on series system and C<sub>
 <italic>s</italic>
</sub> 𝐶 𝑠 is the operational capacity on series system.</p>
				<p>The real reached production of the series system of <xref ref-type="fig" rid="f2">Fig. 2</xref> was determined by <xref ref-type="disp-formula" rid="e3">eq. (3)</xref>, and considering that, from the point of view of availability, a serial system behaves as if it were a single operating unit (equipment, device); in such virtue, the down time of this operative unit is equal to the sum of the individual down times of its components.</p>
				<p>
					<disp-formula id="e7">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e7.png"/>
					</disp-formula>
				</p>
				<p>Where <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i016.png"/> is the real non-manufactured production as a result of the down time on series system and <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i017.png"/> is the total down time on serial system achieved during the required time.</p>
				<p>The current equation for calculating the availability on parallel systems, both active and passive, is following [<xref ref-type="bibr" rid="B8">8</xref>]:</p>
				<p>
					<disp-formula id="e8">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e8.png"/>
					</disp-formula>
				</p>
				<p>Where A<sub>
 <italic>p</italic>
</sub> is the availability of active or passive parallel system, A<sub>
 <italic>pci</italic>
</sub> is the availability of 𝑖th active or passive parallel component, DT<sub>
 <italic>pci</italic> 
</sub> is the down time of i th active or passive parallel component and n is the total number of parallel components.</p>
				<p>The non-manufactured production as a consequence of the down time on active or passive parallel systems was obtained by replacing <xref ref-type="disp-formula" rid="e8">eq. (8)</xref> in <xref ref-type="disp-formula" rid="e4">eq. (4)</xref>:</p>
				<p>
					<disp-formula id="e9">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e9.png"/>
					</disp-formula>
				</p>
				<p>Where <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i020.png"/> is the non-manufactured production as result of down time on active or passive parallel system, C<sub>
 <italic>p</italic>
</sub> is the operational capacity on active or passive parallel system and DT<sub>
 <italic>pci</italic>
</sub> 𝐷𝑇 𝑝𝑐 𝑖 is the down time of i th component on active or passive parallel system.</p>
				<p>The real production reached on active parallel system was determined considering that, in this case, each of the components delivers its production quota individually, in such a way that the production reached by the system is equal to the sum of productions reached for each of its components. Similarly, non-manufactured production as a result of the down time on active parallel system is equal to the sum of the non-manufactured production of each of its components.</p>
				<p>
					<disp-formula id="e10">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e10.png"/>
					</disp-formula>
				</p>
				<p>Where <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i023.png"/> is the real non-manufactured production as a result of the down time on active parallel system and <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i024.png"/> is the real non-manufactured production as a result of the down time of 𝑖th active parallel component.</p>
				<p>The real non-manufactured production as a result of the down time on active parallel system may be expressed in terms of the down time by replacing the <xref ref-type="disp-formula" rid="e2">eq (2)</xref> in <xref ref-type="disp-formula" rid="e10">eq. (10)</xref>:</p>
				<p>
					<disp-formula id="e11">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e11.png"/>
					</disp-formula>
				</p>
				<p>Where C<sub>
 <italic>apci</italic>
</sub> is the operational capacity of i th active parallel component.</p>
				<p>In order to determine the real reached production on passive parallel system, it was considered that, in these systems, one of the components operates actively, while the other one is in stand by state, entering into operation only if the active component suffers an operational failure, preventing production from falling. Consequently, non-manufactured products will be generated only if the two components are simultaneously in a down state; Thus:</p>
				<p>
					<disp-formula id="e12">
						<graphic xlink:href="0012-7353-dyna-85-207-269-e12.png"/>
					</disp-formula>
				</p>
				<p>Where <inline-graphic xlink:href="0012-7353-dyna-85-207-269-i027.png"/> is the real non-manufactured production as a result of down time on passive parallel system, C<sub>
 <italic>pp</italic>
</sub> is the operational capacity on passive parallel system and DT<sub>
 <italic>pp</italic>
</sub> is the simultaneous down time of the two components.</p>
			</sec>
			<sec>
				<title><italic>2.4. Monte Carlo method</italic></title>
				<p>In all the deterministic model equations (<xref ref-type="disp-formula" rid="e6">eqs. 6</xref>, <xref ref-type="disp-formula" rid="e7">7</xref>, <xref ref-type="disp-formula" rid="e9">9</xref>, <xref ref-type="disp-formula" rid="e11">11</xref> and <xref ref-type="disp-formula" rid="e12">12</xref>), 40 hours were pondered for the required time, since this is the total number of hours that is completed from Monday to Friday with a normal working time of 8 hours daily.</p>
				<p>In accordance with the characteristics of series systems exposed in the section &quot;Models of the systems &quot;, it was established that in the stochastic process 20 hours were generated as the maximum random value for the down time of components 1 and 2, so as not to create the possibility that in some iteration the total sum of the down times of <xref ref-type="disp-formula" rid="e7">eq. (7)</xref> exceed required time equal to 40 hours.</p>
				<p>Extending this condition for all deterministic models, it was established that the random entries of down times of components 1 and 2 must be in range of 0 to 20 hours.</p>
				<p>To facilitate the processing of the data, the operational capacity of each of the three modeled systems was pondered at 100 units per hour.</p>
				<p>The simulations were elaborated using algorithms of <xref ref-type="fig" rid="f4">Figs. 4</xref> and <xref ref-type="fig" rid="f5">5</xref>, where the stochastic process was developed with the random generation of the down times on series and parallel systems (DT<sub>
 <italic>sci,</italic> 
</sub> DT<sub>
 <italic>apci,</italic> 
</sub> and DT<sub>
 <italic>pp</italic>
</sub> ), while the deterministic model was satisfied with the calculations of the non-manufactured production with <xref ref-type="disp-formula" rid="e6">eqs. (6)</xref>, (<xref ref-type="disp-formula" rid="e7">7</xref>), (<xref ref-type="disp-formula" rid="e9">9</xref>), (<xref ref-type="disp-formula" rid="e11">11</xref>) and (<xref ref-type="disp-formula" rid="e12">12</xref>).</p>
				<p>To guarantee that the random generation of stochastic process down times may covers the range from 0 to 20 hours, five thousand iterations were performed; while for the comparison of the results of the equations to be analyzed and because many data may be generated with the Monte Carlo method, the central limit theorem with 5000 samples of size 250 (<xref ref-type="fig" rid="f5">Fig. 5</xref>) was used to obtain a good approximation [<xref ref-type="bibr" rid="B19">19</xref>].</p>
				<p>The statistical software R, version 3.5.1 was used to obtain the data and for its subsequent analysis.</p>
			</sec>
		</sec>
		<sec sec-type="results">
			<title>3. Results and analysis</title>
			<p>Before the statistical treatment of the data, it is important to make a comparison of the current and real equations of the series and parallel systems, this is done through the three-dimensional graphs of <xref ref-type="fig" rid="f6">Fig. 6</xref>, where the dependent variable is the non-manufactured products which is represented on the z axis; while the independent variables are defined by the down times 1 and 2 corresponding to the x and y axes respectively.</p>
			<p>
				<fig id="f4">
					<label>Figure 4</label>
					<caption>
						<title>Algorithm for simulation through Monte Carlo method.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gf4.jpg"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>In <xref ref-type="fig" rid="f6">Fig. 6</xref> it may be observed that in all cases there is a positive tendency that starts from the origin; however, when the down time reaches 20 hours, the non-manufactured production differs between current and real methods. In order to have a better appreciation of these differences, the non-manufactured production is tabulated in <xref ref-type="table" rid="t1">Tables 1</xref>, <xref ref-type="table" rid="t2">2</xref> and <xref ref-type="table" rid="t3">3</xref> when the down times are extreme (0 and 20 hours).</p>
			<p>
				<table-wrap id="t1">
					<label>Table 1</label>
					<caption>
						<title>Non-manufactured production of the series system.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt1.png"/>
					<table-wrap-foot>
						<fn id="TFN1">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>
				<table-wrap id="t2">
					<label>Table 2</label>
					<caption>
						<title>Non-manufactured production of the active parallel system.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt2.png"/>
					<table-wrap-foot>
						<fn id="TFN2">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>
				<table-wrap id="t3">
					<label>Table 3</label>
					<caption>
						<title>Non-manufactured production of the passive parallel systems.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt3.png"/>
					<table-wrap-foot>
						<fn id="TFN3">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>As indicated in <xref ref-type="table" rid="t1">Table 1</xref>, on series system, half the required time (20 hours) the component 1 fails and the other half (20 hours) fails the component 2, giving a total of 40 hours, but the system did not operate during this time. Therefore, the non-manufactured production is equal to the nominal production (4000 units), as indicated in <xref ref-type="disp-formula" rid="e7">eq. (7)</xref>. However, with the current equation, 3000 non- manufactured units were obtained, which suggests that, although the system did not operate at any time, 1000 units were manufactured. Result that is impossible to obtain in reality.</p>
			<p>
				<fig id="f5">
					<label>Figure 5</label>
					<caption>
						<title>Algorithm for simulation through the Monte Carlo method for the analysis using the central limit theorem.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gf5.jpg"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>For the active parallel system to have a capacity of 100 units per hour (which is the initial condition of the simulation), each component has to operate with a capacity of 50 units per hour. If in the half of the required time, the component 1 fails and component 2 fails in the other half of required time, the system operates only whit one component at a time, which means that its capacity is reduced by half, generating a non-manufactured production of 2000 units, as indicated in the last row of <xref ref-type="table" rid="t2">Table 2</xref> with <xref ref-type="disp-formula" rid="e11">eq. (11)</xref>
			</p>
			<p>While with the <xref ref-type="disp-formula" rid="e9">eq. (9)</xref>, the non-manufactured production is less than the real one; but the most remarkable thing occurs when only one of the two active parallel component has a down time equal zero, the non-manufactured production is not generated, reaching the nominal production; although, only one component is operated; thus, <xref ref-type="disp-formula" rid="e9">eq (9)</xref> does not fit as expected.</p>
			<p>
				<fig id="f6">
					<label>Figure 6</label>
					<caption>
						<title>Graphical comparison of current and real functions of series and parallel systems</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gf6.jpg"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>Concerning passive parallel systems, their components operate one at a time. In no case operate both at the same time, since the component 2 is a backup, coming into operation, only when the first has failed. These systems are the most reliable, generating non-manufactured production when the main component fails at the same time that the backup component is inoperative (<xref ref-type="disp-formula" rid="e12">eq. (12)</xref> of <xref ref-type="table" rid="t3">Table 3</xref>).</p>
			<p>On the other hand, <xref ref-type="disp-formula" rid="e9">eq. (9)</xref> admits down times without any condition, enabling the generation of non-manufactured production when the two components fail at different time points. So, the <xref ref-type="disp-formula" rid="e9">eq. (9)</xref> neither fits as expected in these systems.</p>
			<p>So far, significant differences may be observed between the real data and those obtained with the current equations; but to make a more effective comparison it is necessary to analyze a lot of cases. For this purpose, the simulation of the algorithm of <xref ref-type="fig" rid="f4">Fig. 4</xref> is used; in which, the results of the first ten and the last iteration are indicated in <xref ref-type="table" rid="t4">Table 4</xref>, where DT<sub>1</sub> and DT<sub>2</sub> are the down times of components 1 and 2 of the systems models of <xref ref-type="fig" rid="f2">Fig. 2</xref> and <xref ref-type="fig" rid="f3">3</xref> respectively, those were obtained randomly in order to be replaced in <xref ref-type="disp-formula" rid="e6">eq. (6)</xref>, (<xref ref-type="disp-formula" rid="e7">7</xref>), (<xref ref-type="disp-formula" rid="e9">9</xref>), (<xref ref-type="disp-formula" rid="e11">11</xref>) and (<xref ref-type="disp-formula" rid="e12">12</xref>) in each of the iterations.</p>
			<p>
				<table-wrap id="t4">
					<label>Table 4</label>
					<caption>
						<title>Results of the first ten and the last iteration of the simulation.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt4.png"/>
					<table-wrap-foot>
						<fn id="TFN4">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>The relative frequency histograms of the results obtained in the 5000 iterations are indicated in <xref ref-type="fig" rid="f7">Fig. 7</xref>, where it is observed that the data does not seem to have a normal distribution, for this reason an analytical normality test is carried out using the Kolmogorov Smirnov method with the modification of Lilliefors, obtaining as a result that none of the variables evaluated are normally distributed, with a confidence of 99%, since in each case the p-value of the test statistic is less than 0.01 (<xref ref-type="table" rid="t5">Table 5</xref>).</p>
			<p>
				<fig id="f7">
					<label>Figure 7</label>
					<caption>
						<title>Relative frequency histograms of the simulated systems.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gf7.jpg"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>
				<table-wrap id="t5">
					<label>Table 5</label>
					<caption>
						<title>Normality test values of the simulated data.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt5.png"/>
					<table-wrap-foot>
						<fn id="TFN5">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>Due to the large amount of data that may be obtained through the simulations, it is decided to apply the central limit theorem with 5000 samples of size 250, which is sufficient for the sample means to be distributed normally. The results of the first 10 sample means and the last one is indicated in <xref ref-type="table" rid="t6">Table 6</xref> and their respective relative frequency histograms are shown in <xref ref-type="fig" rid="f8">Fig. 8</xref>, which seem to be normally distributed.</p>
			<p>
				<table-wrap id="t6">
					<label>Table 6</label>
					<caption>
						<title>Values of the ten first and the last sample means.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt6.png"/>
					<table-wrap-foot>
						<fn id="TFN6">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>
				<fig id="f8">
					<label>Figure 8</label>
					<caption>
						<title>Relative frequency histograms of the sample means.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gf8.jpg"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>Indeed, the analysis of normality by the Kolmogorov Smirnov method with the modification of Lilliefors indicated in <xref ref-type="table" rid="t7">Table 7</xref>, shows that the sample means of the variables evaluated from the non-manufactured production on series and parallel systems are normally distributed, with a 99% confidence, since in each case the p-value of the statistic test is greater than 0.01.</p>
			<p>
				<table-wrap id="t7">
					<label>Table 7</label>
					<caption>
						<title>Results of the normality test of the sample means.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt7.png"/>
					<table-wrap-foot>
						<fn id="TFN7">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>In the statistical comparison by means of the box diagrams of <xref ref-type="fig" rid="f9">Fig. 9</xref>. it can be seen that there is a clear difference between the results of the non-manufactured products calculated with the current equations and the real ones on series and parallel systems. This observation must be confirmed by using analytical statistical methods.</p>
			<p>
				<fig id="f9">
					<label>Figure 9</label>
					<caption>
						<title>Box diagrams of the sample means of the results of the non-manufactured products calculated with the current equations and the real ones.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gf9.jpg"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>Given that, the sample means of the variables have a normal distribution, it proceeds to evaluate the efficacy of the current equations by means of the parametric statistic t; where the H<sub>0</sub> corresponds to the equality of the sample means, which indicates that the current equations are effective. The averages of the sample means are indicated in <xref ref-type="table" rid="t8">Table 8</xref>, while the results of this test are shown in <xref ref-type="table" rid="t9">Table 9</xref>.</p>
			<p>
				<table-wrap id="t8">
					<label>Table 8</label>
					<caption>
						<title>Averages of the sample means.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt8.png"/>
					<table-wrap-foot>
						<fn id="TFN8">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>
				<table-wrap id="t9">
					<label>Table 9</label>
					<caption>
						<title>Test t results.</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-207-269-gt9.png"/>
					<table-wrap-foot>
						<fn id="TFN9">
							<p><bold>Source:</bold> The authors.</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>Since the p-value obtained with the t statistic is less than 0.01 for each of the systems (<xref ref-type="table" rid="t9">Table 9</xref>), the H<sub>0</sub> is rejected, therefore, there is sufficient evidence to demonstrate that the two samples have different measures with the 99% confidence in each case, which means that the current equations for the calculation of the availability on series and parallel systems, give different results in comparison with the real ones.</p>
		</sec>
		<sec sec-type="conclusions">
			<title>4. Conclusions</title>
			<p>The production losses are proportional to the down time of each system component, for this reason this calculation may be used to deduce an equation that relates the non-manufactured production with the availability of each component of series and parallel system.</p>
			<p>The non-manufactured products resulting from the simulations using the Monte Carlo method are not normally distributed in the three systems analyzed; however, the sample means when applying the central limit theorem are distributed normally. They allow to evaluate the data by parametric methods.</p>
			<p>The t statistic test that allows to compare of sample means distributions, shows that the current equations are ineffective with a confidence of 99%.</p>
		</sec>
	</body>
	<back>
		<ref-list>
			<title>References</title>
			<ref id="B1">
				<label>[1]</label>
				<mixed-citation>[1] Benson, F. and Cox, D.R., The productivity of machines requiring attention at random intervals, Journal of the Royal Statistical Society. Series B, [online]. 13(1), pp. 65-82, 1951. Available at: <ext-link ext-link-type="uri" xlink:href="https://www.jstor.org/stable/2983968">https://www.jstor.org/stable/2983968</ext-link>
				</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Benson</surname>
							<given-names>F.</given-names>
						</name>
						<name>
							<surname>Cox</surname>
							<given-names>D.R</given-names>
						</name>
					</person-group>
					<article-title>The productivity of machines requiring attention at random intervals</article-title>
					<source>Journal of the Royal Statistical Society. Series B</source>
					<volume>13</volume>
					<issue>1</issue>
					<fpage>65</fpage>
					<lpage>82</lpage>
					<year>1951</year>
					<ext-link ext-link-type="uri" xlink:href="https://www.jstor.org/stable/2983968">https://www.jstor.org/stable/2983968</ext-link>
				</element-citation>
			</ref>
			<ref id="B2">
				<label>[2]</label>
				<mixed-citation>[2] Leibholz, S.W., System effectiveness as a generalization of system availability, IEEE Transactions on Electronic Computers, EC-16(4), pp. 500-505, 1967. DOI: 10.1109/PGEC.1967.264671</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Leibholz</surname>
							<given-names>S.W</given-names>
						</name>
					</person-group>
					<article-title>System effectiveness as a generalization of system availability</article-title>
					<source>IEEE Transactions on Electronic Computers</source>
					<volume>16</volume>
					<issue>4</issue>
					<fpage>500</fpage>
					<lpage>505</lpage>
					<year>1967</year>
					<pub-id pub-id-type="doi">10.1109/PGEC.1967.264671</pub-id>
				</element-citation>
			</ref>
			<ref id="B3">
				<label>[3]</label>
				<mixed-citation>[3] Mesa, D.H., Ortiz, Y. Y Pinzón, M,. La confiabilidad, la disponibilidad y la mantenibilidad, disciplinas modernas aplicadas al mantenimiento, Scientia et Technica. XII(30), pp. 155-160, 2006. DOI: 10.22517/23447214.6513</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Mesa</surname>
							<given-names>D.H</given-names>
						</name>
					</person-group>
					<person-group person-group-type="author">
						<name>
							<surname>Ortiz</surname>
							<given-names>Y</given-names>
						</name>
					</person-group>
					<person-group person-group-type="author">
						<name>
							<surname>Pinzón</surname>
							<given-names>M</given-names>
						</name>
					</person-group>
					<article-title>La confiabilidad, la disponibilidad y la mantenibilidad, disciplinas modernas aplicadas al mantenimiento</article-title>
					<source>Scientia et Technica</source>
					<volume>XII</volume>
					<issue>30</issue>
					<fpage>155</fpage>
					<lpage>160</lpage>
					<year>2006</year>
					<pub-id pub-id-type="doi">10.22517/23447214.6513</pub-id>
				</element-citation>
			</ref>
			<ref id="B4">
				<label>[4]</label>
				<mixed-citation>[4] Pryor, G., Methodology for estimation of operational availability as applied to military systems, ITEA Journal, [online]. 29(4), pp. 420-428, 2008. Available at: <ext-link ext-link-type="uri" xlink:href="https://apps.dtic.mil/docs/citations/ADA518378">https://apps.dtic.mil/docs/citations/ADA518378</ext-link>
				</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Pryor</surname>
							<given-names>G</given-names>
						</name>
					</person-group>
					<article-title>Methodology for estimation of operational availability as applied to military systems</article-title>
					<source>ITEA Journal</source>
					<volume>29</volume>
					<issue>4</issue>
					<fpage>420</fpage>
					<lpage>428</lpage>
					<year>2008</year>
					<ext-link ext-link-type="uri" xlink:href="https://apps.dtic.mil/docs/citations/ADA518378">https://apps.dtic.mil/docs/citations/ADA518378</ext-link>
				</element-citation>
			</ref>
			<ref id="B5">
				<label>[5]</label>
				<mixed-citation>[5] Melo, R., Lara, C. y Jacobo, F., Estimación de la confiabilidad-disponibilidad- mantenibilidad mediante una simulación tipo Monte Carlo de un sistema de compresión de gas amargo durante la etapa de ingeniería, Tecnología, Ciencia, Educación, [en línea]. 24(2), pp. 93-104, 2009. Disponible en: <ext-link ext-link-type="uri" xlink:href="http://www.redalyc.org/articulo.oa?id=48213841002">http://www.redalyc.org/articulo.oa?id=48213841002</ext-link>
				</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Melo</surname>
							<given-names>R.</given-names>
						</name>
						<name>
							<surname>Lara</surname>
							<given-names>C.</given-names>
						</name>
						<name>
							<surname>Jacobo</surname>
							<given-names>F</given-names>
						</name>
					</person-group>
					<article-title>Estimación de la confiabilidad-disponibilidad- mantenibilidad mediante una simulación tipo Monte Carlo de un sistema de compresión de gas amargo durante la etapa de ingeniería</article-title>
					<source>Tecnología, Ciencia, Educación</source>
					<volume>24</volume>
					<issue>2</issue>
					<fpage>93</fpage>
					<lpage>104</lpage>
					<year>2009</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.redalyc.org/articulo.oa?id=48213841002">http://www.redalyc.org/articulo.oa?id=48213841002</ext-link>
				</element-citation>
			</ref>
			<ref id="B6">
				<label>[6]</label>
				<mixed-citation>[6] Hernández, E., Angulo, B., Fiallos, P. y Chávez, V., Método para el cálculo del costo de la indisponibilidad en procesos productivos, Perfiles, 1, [en línea]. pp. 90-98, 2017. Disponible en: <ext-link ext-link-type="uri" xlink:href="http://ceaa.espoch.edu.ec:8080/revista.perfiles/faces/Articulos/Art11Edicion17.pdf">http://ceaa.espoch.edu.ec:8080/revista.perfiles/faces/Articulos/Art11Edicion17.pdf</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Hernández</surname>
							<given-names>E.</given-names>
						</name>
						<name>
							<surname>Angulo</surname>
							<given-names>B.</given-names>
						</name>
						<name>
							<surname>Fiallos</surname>
							<given-names>P.</given-names>
						</name>
						<name>
							<surname>Chávez</surname>
							<given-names>V</given-names>
						</name>
					</person-group>
					<source>Método para el cálculo del costo de la indisponibilidad en procesos productivos, Perfiles, 1</source>
					<fpage>90</fpage>
					<lpage>98</lpage>
					<year>2017</year>
					<ext-link ext-link-type="uri" xlink:href="http://ceaa.espoch.edu.ec:8080/revista.perfiles/faces/Articulos/Art11Edicion17.pdf">http://ceaa.espoch.edu.ec:8080/revista.perfiles/faces/Articulos/Art11Edicion17.pdf</ext-link>
				</element-citation>
			</ref>
			<ref id="B7">
				<label>[7]</label>
				<mixed-citation>[7] Ali, I., Khan, M., Raghav, Y. and Bari, A., Allocation of repairable and replaceable components for a system availability using selective maintenance with probabilistic maintenance time constraints, American Journal of Operations Research, 01(0)3, pp. 147-154, 2011. DOI: 10.4236/ajor.2011.13016</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Ali</surname>
							<given-names>I.</given-names>
						</name>
						<name>
							<surname>Khan</surname>
							<given-names>M.</given-names>
						</name>
						<name>
							<surname>Raghav</surname>
							<given-names>Y.</given-names>
						</name>
						<name>
							<surname>Bari</surname>
							<given-names>A</given-names>
						</name>
					</person-group>
					<article-title>Allocation of repairable and replaceable components for a system availability using selective maintenance with probabilistic maintenance time constraints</article-title>
					<source>American Journal of Operations Research</source>
					<volume>01</volume>
					<issue>3</issue>
					<fpage>147</fpage>
					<lpage>154</lpage>
					<year>2011</year>
					<pub-id pub-id-type="doi">10.4236/ajor.2011.13016</pub-id>
				</element-citation>
			</ref>
			<ref id="B8">
				<label>[8]</label>
				<mixed-citation>[8] Hu, L., Yue, D. and Zhao, D., Availability equivalence analysis of a repairable series-parallel system, Mathematical Problems in Engineering, 2012, 15 P, 2012. DOI: 10.1155/2012/957537</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Hu</surname>
							<given-names>L.</given-names>
						</name>
						<name>
							<surname>Yue</surname>
							<given-names>D.</given-names>
						</name>
						<name>
							<surname>Zhao</surname>
							<given-names>D</given-names>
						</name>
					</person-group>
					<article-title>Availability equivalence analysis of a repairable series-parallel system</article-title>
					<source>Mathematical Problems in Engineering</source>
					<year>2012</year>
					<fpage>15</fpage>
					<lpage>15</lpage>
					<pub-id pub-id-type="doi">10.1155/2012/957537</pub-id>
				</element-citation>
			</ref>
			<ref id="B9">
				<label>[9]</label>
				<mixed-citation>[9] Mustafa, A. and Sarhan, A., Availability equivalence factors of a general repairable parallel-series system, Applied Mathematics, June, pp. 1713-1723, 2014. DOI: 10.4236/am.2014.511164</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Mustafa</surname>
							<given-names>A.</given-names>
						</name>
						<name>
							<surname>Sarhan</surname>
							<given-names>A</given-names>
						</name>
					</person-group>
					<article-title>Availability equivalence factors of a general repairable parallel-series system</article-title>
					<source>Applied Mathematics</source>
					<fpage>1713</fpage>
					<lpage>1723</lpage>
					<year>2014</year>
					<pub-id pub-id-type="doi">10.4236/am.2014.511164</pub-id>
				</element-citation>
			</ref>
			<ref id="B10">
				<label>[10]</label>
				<mixed-citation>[10] O’Neill, T., System reliability assessment from its components, Journal of the Royal Statistical Society. Series C, 114(2), pp. 139-162, 1972. DOI: 10.2307/2346279</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>O’Neill</surname>
							<given-names>T</given-names>
						</name>
					</person-group>
					<article-title>System reliability assessment from its components</article-title>
					<source>Journal of the Royal Statistical Society. Series C</source>
					<volume>114</volume>
					<issue>2</issue>
					<fpage>139</fpage>
					<lpage>162</lpage>
					<year>1972</year>
					<pub-id pub-id-type="doi">10.2307/2346279</pub-id>
				</element-citation>
			</ref>
			<ref id="B11">
				<label>[11]</label>
				<mixed-citation>[11] Birnbaum, Z.W., On the importance of different components in a multicomponent system, Laboratory of Statistical Research, Department of Mathematics, University of Washington, 1968. Available at: <ext-link ext-link-type="uri" xlink:href="https://apps.dtic.mil/docs/citations/AD0670563">https://apps.dtic.mil/docs/citations/AD0670563</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Birnbaum</surname>
							<given-names>Z.W</given-names>
						</name>
					</person-group>
					<source>On the importance of different components in a multicomponent system, Laboratory of Statistical Research</source>
					<publisher-name>Department of Mathematics, University of Washington</publisher-name>
					<year>1968</year>
					<ext-link ext-link-type="uri" xlink:href="https://apps.dtic.mil/docs/citations/AD0670563">https://apps.dtic.mil/docs/citations/AD0670563</ext-link>
				</element-citation>
			</ref>
			<ref id="B12">
				<label>[12]</label>
				<mixed-citation>[12] Xie, W., Liao, H. and Jin, T., Maximizing system availability through joint decision on component redundancy and spares inventory, European Journal of Operational Research, 237(1), pp. 164-176, 2014. DOI: 10.1016/j.ejor.2014.02.031</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Xie</surname>
							<given-names>W.</given-names>
						</name>
						<name>
							<surname>Liao</surname>
							<given-names>H.</given-names>
						</name>
						<name>
							<surname>Jin</surname>
							<given-names>T</given-names>
						</name>
					</person-group>
					<article-title>Maximizing system availability through joint decision on component redundancy and spares inventory</article-title>
					<source>European Journal of Operational Research</source>
					<volume>237</volume>
					<issue>1</issue>
					<fpage>164</fpage>
					<lpage>176</lpage>
					<year>2014</year>
					<pub-id pub-id-type="doi">10.1016/j.ejor.2014.02.031</pub-id>
				</element-citation>
			</ref>
			<ref id="B13">
				<label>[13]</label>
				<mixed-citation>[13] Borba, E. and Tavares, E., Stochastic modeling for performance and availability evaluation of hybrid storage systems, Journal of Systems and Software, 134, pp. 1-11, 2017. DOI: 10.1016/j.jss.2017.08.043</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Borba</surname>
							<given-names>E.</given-names>
						</name>
						<name>
							<surname>Tavares</surname>
							<given-names>E</given-names>
						</name>
					</person-group>
					<article-title>Stochastic modeling for performance and availability evaluation of hybrid storage systems</article-title>
					<source>Journal of Systems and Software</source>
					<volume>134</volume>
					<fpage>1</fpage>
					<lpage>11</lpage>
					<year>2017</year>
					<pub-id pub-id-type="doi">10.1016/j.jss.2017.08.043</pub-id>
				</element-citation>
			</ref>
			<ref id="B14">
				<label>[14]</label>
				<mixed-citation>[14] Chiacchio, F., D’Urso, D., Famoso, F., Brusca, S., Aizpurua, J.I. and Catterson, V.M., On the use of dynamic reliability for an accurate modelling of renewable power plants, Energy, 151, pp. 605-621, 2018. DOI: 10.1016/j.energy.2018.03.101</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Chiacchio</surname>
							<given-names>F.</given-names>
						</name>
						<name>
							<surname>D’Urso</surname>
							<given-names>D.</given-names>
						</name>
						<name>
							<surname>Famoso</surname>
							<given-names>F.</given-names>
						</name>
						<name>
							<surname>Brusca</surname>
							<given-names>S.</given-names>
						</name>
						<name>
							<surname>Aizpurua</surname>
							<given-names>J.I.</given-names>
						</name>
						<name>
							<surname>Catterson</surname>
							<given-names>V.M</given-names>
						</name>
					</person-group>
					<article-title>On the use of dynamic reliability for an accurate modelling of renewable power plants</article-title>
					<source>Energy</source>
					<volume>151</volume>
					<fpage>605</fpage>
					<lpage>621</lpage>
					<year>2018</year>
					<pub-id pub-id-type="doi">10.1016/j.energy.2018.03.101</pub-id>
				</element-citation>
			</ref>
			<ref id="B15">
				<label>[15]</label>
				<mixed-citation>[15] Epstein, B. and Weissman, I., Mathematical models for systems reliability. New York: Taylor &amp; Francis Group, 2008.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Epstein</surname>
							<given-names>B.</given-names>
						</name>
						<name>
							<surname>Weissman</surname>
							<given-names>I</given-names>
						</name>
					</person-group>
					<source>Mathematical models for systems reliability</source>
					<publisher-loc>New York</publisher-loc>
					<publisher-name>Taylor &amp; Francis Group</publisher-name>
					<year>2008</year>
				</element-citation>
			</ref>
			<ref id="B16">
				<label>[16]</label>
				<mixed-citation>[16] Parra, C.A. Y Crespo, A., Ingeniería de mantenimiento y fiabilidad aplicada en gestión de activos : desarrollo y aplicación práctica de un modelo de gestión del mantenimiento (MGM), 1a ed. Sevilla: Ingeman, 2012.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Parra</surname>
							<given-names>C.A</given-names>
						</name>
					</person-group>
					<person-group person-group-type="author">
						<name>
							<surname>Crespo</surname>
							<given-names>A</given-names>
						</name>
					</person-group>
					<source>Ingeniería de mantenimiento y fiabilidad aplicada en gestión de activos : desarrollo y aplicación práctica de un modelo de gestión del mantenimiento (MGM)</source>
					<edition>1a </edition>
					<publisher-loc>Sevilla</publisher-loc>
					<publisher-name>Ingeman</publisher-name>
					<year>2012</year>
				</element-citation>
			</ref>
			<ref id="B17">
				<label>[17]</label>
				<mixed-citation>[17] CEN, EN 13306: Maintenance - Maintenance terminology. Brussels, 2010.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>CEN</collab>
					</person-group>
					<source>EN 13306: Maintenance - Maintenance terminology</source>
					<publisher-loc>Brussels</publisher-loc>
					<year>2010</year>
				</element-citation>
			</ref>
			<ref id="B18">
				<label>[18]</label>
				<mixed-citation>[18] CEN, EN 15341: Maintenance - Maintenance Key Performance Indicators. Brussels, 2007.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>CEN</collab>
					</person-group>
					<source>EN 15341: Maintenance - Maintenance Key Performance Indicators</source>
					<publisher-loc>Brussels</publisher-loc>
					<year>2007</year>
				</element-citation>
			</ref>
			<ref id="B19">
				<label>[19]</label>
				<mixed-citation>[19] Navidi, W., Estadística para ingenieros. México: McGraw-Hill Companies, Inc., 2006.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Navidi</surname>
							<given-names>W</given-names>
						</name>
					</person-group>
					<source>Estadística para ingenieros</source>
					<publisher-loc>México</publisher-loc>
					<publisher-name>McGraw-Hill Companies, Inc</publisher-name>
					<year>2006</year>
				</element-citation>
			</ref>
		</ref-list>
		<fn-group>
			<fn fn-type="other" id="fn1">
				<label>How to cite:</label>
				<p> Hernández-Dávila, E.S., Granizo, J.A., Santillán-Gallegos, M. and Haro-Medina, M., Analysis of the efficacy of operational availability equations on series and parallel systems. DYNA, 85(207), pp. 269-277, Octubre - Diciembre, 2018</p>
			</fn>
		</fn-group>
		<fn-group>
			<fn fn-type="other" id="fn2">
				<label>E.S. Hernández-Dávila,</label>
				<p> received the BSc. Eng. in Maintenance Engineering in 2003, the MSc. degree in Industrial Maintenance Management in 2015, From 2003 to 2008, he worked for maintenance department of companies in the industrial sector and since 2008 for the Escuela Superior Politécnica de Chimborazo, Ecuador, in the Facultad de Mecánica. Currently, he is coordinator of the research project development of means and equipment for the alignment of shafts of industrial machinery. ORCID: 0000-0003-4899-2371.</p>
			</fn>
			<fn fn-type="other" id="fn3">
				<label>J.A. Granizo,</label>
				<p> received the BSc. Eng in Mechanical Engineering in 1982 and the PhD degree in Technical Sciences in 1988, since 1989 he is a full professor in the Facultad de Mecánica, Escuela Superior Politécnica de Chimborazo, Ecuador. Currently he is researcher of the Department of Tribology. ORCID: 0000-0002-4648-1191</p>
			</fn>
			<fn fn-type="other" id="fn4">
				<label>M.H. Santillán-Gallegos,</label>
				<p> received the BSc. Eng Electromechanical Engineering in 1987, the MSc. degree in Engineering in 1999, the MSc. degree in Planning, Evaluation and Accreditation of Higher Education in 2010, since 1988 he is a full professor in the Facultad de Mecánica, Escuela Superior Politécnica de Chimborazo. Currently, he is researcher of the research project development of means and equipment for the alignment of shafts of industrial machinery. ORCID: 0000-0001-7145-5350</p>
			</fn>
			<fn fn-type="other" id="fn5">
				<label>M.A. Haro-Medina,</label>
				<p> received the BSc. Dr. in Educational Sciences, mention of educational informatics in 2002, the MSc. degree in Educational Teaching and Research in 2002, since 1989 he is a full professor in the Facultad de Mecánica, Escuela Superior Politécnica de Chimborazo, Ecuador. Currently, he is researcher of the research project development of means and equipment for the alignment of shafts of industrial machinery and Director of the Escuela de Ingeniería de Mantenimiento, Facultad de Mecánica, Escuela Superior Politécnica de Chimborazo, Ecuador. ORCID: 0000-0002-4238-1767</p>
			</fn>
		</fn-group>
	</back>
</article>