<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE article
  PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.0 20120330//EN" "http://jats.nlm.nih.gov/publishing/1.0/JATS-journalpublishing1.dtd">
<article article-type="research-article" dtd-version="1.0" specific-use="sps-1.6" xml:lang="en" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">
	<front>
		<journal-meta>
			<journal-id journal-id-type="publisher-id">dyna</journal-id>
			<journal-title-group>
				<journal-title>DYNA</journal-title>
				<abbrev-journal-title abbrev-type="publisher">Dyna rev.fac.nac.minas</abbrev-journal-title>
			</journal-title-group>
			<issn pub-type="ppub">0012-7353</issn>
			<publisher>
				<publisher-name>Universidad Nacional de Colombia</publisher-name>
			</publisher>
		</journal-meta>
		<article-meta>
			<article-id pub-id-type="doi">10.15446/dyna.v85n206.69577</article-id>
			<article-categories>
				<subj-group subj-group-type="heading">
					<subject>Artículos</subject>
				</subj-group>
			</article-categories>
			<title-group>
				<article-title>Levelized avoided cost of electricity model based on power system operation</article-title>
				<trans-title-group xml:lang="es">
					<trans-title>Modelo de costo evitado nivelado de electricidad basado en la operación del sistema de potencia</trans-title>
				</trans-title-group>
			</title-group>
			<contrib-group>
				<contrib contrib-type="author">
					<name>
						<surname>Marín-Cano</surname>
						<given-names>Cristian Camilo</given-names>
					</name>
					<xref ref-type="aff" rid="aff1"><sup>a</sup></xref>
				</contrib>
				<contrib contrib-type="author">
					<name>
						<surname>Mejía-Giraldo</surname>
						<given-names>Diego Adolfo</given-names>
					</name>
					<xref ref-type="aff" rid="aff2"><sup>b</sup></xref>
				</contrib>
			</contrib-group>
			<aff id="aff1">
				<label>a</label>
				<institution content-type="original"> Grupo de investigación GIMEL, Universidad de Antioquia, Medellín, Colombia. ccamilo.marin@udea.edu.co</institution>
				<institution content-type="normalized">Universidad de Antioquia</institution>
				<institution content-type="orgdiv1">Grupo de investigación GIMEL</institution>
				<institution content-type="orgname">Universidad de Antioquia</institution>
				<addr-line>
					<named-content content-type="city">Medellín</named-content>
				</addr-line>
				<country country="CO">Colombia</country>
				<email>ccamilo.marin@udea.edu.co</email>
			</aff>
			<aff id="aff2">
				<label>b</label>
				<institution content-type="original"> Departamento de Ingeniería Eléctrica, Facultad de Ingeniería, Universidad de Antioquia, Medellín, Colombia. diego.mejia@udea.edu.co</institution>
				<institution content-type="normalized">Universidad de Antioquia</institution>
				<institution content-type="orgdiv2">Departamento de Ingeniería Eléctrica</institution>
				<institution content-type="orgdiv1">Facultad de Ingeniería</institution>
				<institution content-type="orgname">Universidad de Antioquia</institution>
				<addr-line>
					<named-content content-type="city">Medellín</named-content>
				</addr-line>
				<country country="CO">Colombia</country>
				<email>diego.mejia@udea.edu.co</email>
			</aff>
			<pub-date pub-type="epub-ppub">
				<season>Jul-Sep</season>
				<year>2018</year>
			</pub-date>
			<volume>85</volume>
			<issue>206</issue>
			<fpage>79</fpage>
			<lpage>84</lpage>
			<history>
				<date date-type="received">
					<day>26</day>
					<month>12</month>
					<year>2017</year>
				</date>
				<date date-type="rev-recd">
					<day>21</day>
					<month>06</month>
					<year>2018</year>
				</date>
				<date date-type="accepted">
					<day>24</day>
					<month>07</month>
					<year>2018</year>
				</date>
			</history>
			<permissions>
				<license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by-nc-nd/4.0/" xml:lang="en">
					<license-p>This is an open-access article distributed under the terms of the Creative Commons Attribution License</license-p>
				</license>
			</permissions>
			<abstract>
				<title>Abstract</title>
				<p>This paper presents a methodology to estimate the Levelized Avoided Cost of Electricity (LACE) of new generation projects based on the assessment of economic and operational benefits perceived by an existing power system. The marginal economic benefit caused by the integration of a new generation project is captured using the Differential Revenue Requirement method (DRR); whereas the operational benefits are observed by analyzing the performance of the new project through a preventive DC Security-Constrained Optimal Power Flow (SCOPF) tool. The SCOPF also allows quantifying economic benefits due to replacement of expensive generation, transmission congestion, and N-1 security improvement. Additionally, another metric, called Net Benefit (NB) of a generation project, expressed as the difference between LACE and LCOE (Levelized Cost of Electricity) is also employed in this work. It provides a realistic, easy-to-compute, and intuitive index that helps identifying the most promising generation projects during system expansion planning procedures. Finally, the proposed methodology is applied for computing LACE and NB of different generation projects in Colombia. According to the results, geothermal projects display the most significant LACE and NB. These metrics (LACE and NB) can become useful tools for decision-making in planning process.</p>
			</abstract>
			<trans-abstract xml:lang="es">
				<title>Resumen</title>
				<p>Este artículo propone una metodología para estimar el Costo Evitado Nivelado de Electricidad (LACE) de nuevos proyectos de generación basados en la evaluación de beneficios económicos y operacionales, percibidos por un sistema de potencia existente. El beneficio económico marginal causado por la integración de un nuevo proyecto de generación es capturado usando el método Requerimiento de Ingreso Diferencial (DRR); mientras los beneficios operacionales son observados al analizar el desempeño del nuevo proyecto de generación a través un Flujo de Potencia Óptimo DC con Restricciones de Seguridad (SCOPF). SCOPF además permite cuantificar beneficios económicos debido al reemplazo de generación costosa, congestión de la transmisión y mejoramiento de la seguridad N-1. Adicionalmente, en este trabajo se emplea otra métrica, llamada Beneficio Neto (NB) de un proyecto de generación, expresado como la diferencia entre LACE y LCOE (Costo Nivelado de Electricidad). NB proporciona un índice intuitivo, realista y fácil de calcular, que ayuda a identificar los proyectos de generación más promisorios durante los procesos de planeación de la expansión del sistema. Finalmente, la metodología propuesta es aplicada para calcular LACE y NB de diferentes proyectos de generación en Colombia. De acuerdo a los resultados, los proyectos geotérmicos muestran los LACE y NB más significantes. Estas métricas (LACE y NB) pueden llegar a ser útiles herramientas para la toma de decisiones en procesos de planeación. </p>
			</trans-abstract>
			<kwd-group xml:lang="en">
				<title>Keywords:</title>
				<kwd>levelized costs of Electricity</kwd>
				<kwd>avoided costs of electricity</kwd>
				<kwd>generation expansion planning</kwd>
				<kwd>power system optimization</kwd>
				<kwd>security-constrained optimal power flow</kwd>
			</kwd-group>
			<kwd-group xml:lang="es">
				<title>Palabras clave:</title>
				<kwd>costo nivelado de electricidad</kwd>
				<kwd>costo evitado de electricidad</kwd>
				<kwd>planeación de expansión de generación</kwd>
				<kwd>optimización de sistemas de potencia</kwd>
				<kwd>flujo óptimo de potencia con restricciones de seguridad</kwd>
			</kwd-group>
			<counts>
				<fig-count count="2"/>
				<table-count count="1"/>
				<equation-count count="11"/>
				<ref-count count="24"/>
				<page-count count="6"/>
			</counts>
		</article-meta>
	</front>
	<body>
		<sec sec-type="intro">
			<title>1. Introduction</title>
			<p>During electrical generation expansion planning process, economic benefits, size and operative performance of different generation alternatives are evaluated by using technical and financial metrics. The well-known Levelized Cost of Electricity (LCOE) is a common financial indicator of different generation projects. According to different authors [<xref ref-type="bibr" rid="B1">1</xref>-<xref ref-type="bibr" rid="B4">4</xref>], the LCOE is the electricity price, in constant currency, at which energy output must be sold over the generation project life cycle for covering investment and O&amp;M expenses, and return of capital to investors. </p>
			<p>Although LCOE of different projects can be used to offer indicative signals for generation expansion planning [<xref ref-type="bibr" rid="B5">5</xref>], it has also been exposed that LCOE is not useful for comparing financial performance between intermittent and dispatchable generation technologies [<xref ref-type="bibr" rid="B6">6</xref>]. Also, according to [<xref ref-type="bibr" rid="B5">5</xref>], LCOE does not capture effects of power system dynamics. In order to overcome potential drawbacks of LCOE, the Energy Information Administration [<xref ref-type="bibr" rid="B7">7</xref>] has proposed to use the Levelized Avoided Cost of Electricity (LACE) under the context of the US electricity market. The LACE allows to effectively asses the technical-economic performance of a new generation project. Computing LACE requires the concept of Avoided Cost (AC), which represents potential cost savings in a power system once a new generation project is considered in the power system operations. The levelized term indicates an average cost per MWh of generation. This advantages work presents a novel methodology for computing LACE including operational features of a power system. We evaluate the economic benefit (or even disadvantage) of integrating a particular generation project into the power system by considering its technical operational characteristics and its impact on the economic dispatch. Thus, LACE can be used as a complementary indicator that provides decision makers with realistic and representative signals about generation expansion decisions.</p>
			<p>The first contribution of this work is the proposed approach based on combining the DDR method supported by an operational tool like the SCOPF in order to effectively capture benefits (and/or disadvantages) of new generation projects. Not only does this tool evaluate an optimal power flow under normal conditions, but also N-1 post-contingency states are exhaustively considered. If the new project is a non-dispatchable technology (e.g. solar and wind), typical power output profiles are considered for computing LACE. The second contribution is the consideration of different generation scenarios within the power system for computing LACE of the new project. This approach allows to approximately capture the average value of a specific generation project over a set of generation as opposed to LCOE models that only employ a base case generation scenario of the project.</p>
		</sec>
		<sec>
			<title>2. Literature review</title>
			<p>LACE is conceptually a complementary indicator to LCOE that effectively asses the technical-economic performance of a generation project [<xref ref-type="bibr" rid="B7">7</xref>]. It is based on the concept of AC, which has been a public policy tool within energy efficiency context in the US, and it was stated under the Public Utilities Regulatory Policies Act (PURPA) in 1978 [<xref ref-type="bibr" rid="B8">8</xref>]. At the international level, several energy-related institutions [<xref ref-type="bibr" rid="B7">7</xref>,<xref ref-type="bibr" rid="B9">9</xref>-<xref ref-type="bibr" rid="B12">12</xref>], have estimated AC as alternative indicators that provide appropriate signals for investors and planners. Besides, references [<xref ref-type="bibr" rid="B8">8</xref>,<xref ref-type="bibr" rid="B13">13</xref>] argue that AC is based on marginal cost of the power system, and its calculation can provide useful cost saving indicators to investors.</p>
			<p>Estimating the AC of a generation project is important for identifying the most promising generation choice [<xref ref-type="bibr" rid="B14">14</xref>,<xref ref-type="bibr" rid="B15">15</xref>]. Several long-term approaches have been proposed to estimate AC [<xref ref-type="bibr" rid="B8">8</xref>,<xref ref-type="bibr" rid="B14">14</xref>,<xref ref-type="bibr" rid="B15">15</xref>]. One of these approaches is the so-called Differential Revenue Requirement (DRR), which, according to [<xref ref-type="bibr" rid="B14">14</xref>], is the most comprehensive. In order to determine the economic and technical effect on the system of a new generation project, the DRR method can be employed. It compares the operational cost of a power system with and without the new generation project.</p>
		</sec>
		<sec sec-type="methods">
			<title>3. Proposed LACE methodology</title>
			<p>Our LACE approach of a specific generation project is based on finding measures that capture the potential impacts, either advantages or disadvantages that the project can offer to the power system. Authors strongly believe these impacts have to be obtained by looking at the potential power system operation under different conditions. The goal of our approach is, therefore, to identify whether the project construction can replace other generation resources due to economic or technical reasons. A new generation project can improve either system security under N-1 contingencies, provide firm energy, offer support during peak demand periods, or replace a more expensive generation. Thus, our LACE indicator not only assesses the economic performance of the project, but also captures operational characteristics of the same.</p>
		</sec>
		<sec sec-type="methods">
			<title>4. Power system methodology assessment</title>
			<p>The power system assessment is performed employing a Preventive DC SCOPF. The SCOPF is an economic dispatch, which ensures a secure power system operation under N-1 transmission contingencies. The interested reader may consult references [<xref ref-type="bibr" rid="B16">16</xref>-<xref ref-type="bibr" rid="B18">18</xref>] for additional details. Additionally, author propose the use of generation scenarios to provide a more effective LACE that takes into account the performance of the project under different system operating points.</p>
			<p>In this setup, the SCOPF model returns the estimated annual operational cost f 0 (ω) of the system under generation scenario ω, which is the optimal objective of the following mixed-integer linear optimization problem: </p>
			<p>
				<disp-formula id="e1">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e1.jpg"/>
				</disp-formula>
			</p>
			<p>subject to:</p>
			<p>
				<disp-formula id="e2">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e2.jpg"/>
				</disp-formula>
			</p>
			<p>
				<disp-formula id="e3">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e3.jpg"/>
				</disp-formula>
			</p>
			<p>
				<disp-formula id="e4">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e4.jpg"/>
				</disp-formula>
			</p>
			<p>
				<disp-formula id="e5">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e5.jpg"/>
				</disp-formula>
			</p>
			<p>
				<disp-formula id="e6">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e6.jpg"/>
				</disp-formula>
			</p>
			<p>Where: </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i008.png"/>: is the set of the power system buses.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i009.png"/>: is the set of existing generators connected at bus i.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i010.png"/>: is the set of generators. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i011.png"/>: is the set of transmission lines.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i012.png"/> is the set of post-contingency states.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i013.png"/>: is the set of demand blocks. A load duration curve that represents annual demand by a sequence of load blocks is employed. A demand level (peak, medium, minimum) and its corresponding number of hours in a year define each demand block b.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i014.png"/>: is the number of hours per year in which demand block b occurs.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i015.png"/>: is the operation cost of each generator in generation scenario ω.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i016.png"/>: base power (100 MVA).</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i017.png"/>: is the power generation dispatched by generator g during demand block b when generation scenario ω is simulated.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i018.png"/>: is the power flow through transmission line l during demand block b under contingency state k. k = 0 denotes the pre-contingency or normal condition state. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i019.png"/>: is the transmission line set that ends at bus i.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i020.png"/>: is the transmission line set that starts at bus i.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i021.png"/>: is the power demand at bus i in block b.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i022.png"/>: is the voltage angle at bus i in block b under post-contingency state k.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i023.png"/>: is the electrical impedance of the transmission line l. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i024.png"/>: is the transmission line status parameter; it is 0 if transmission line l is outaged under contingency k, or 1 otherwise. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i025.png"/>: represents the maximum power flow on transmission line l.</p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i026.png"/>: is a long-term overload factor that is usually defined in the range [1, 1.3] [<xref ref-type="bibr" rid="B19">19</xref>]. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i027.png"/>: is a binary decision variable; it is 1 if generator g is online, or 0 otherwise. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i028.png"/>: represents the power availability factor of each generator g. A<sub>
 <italic>g,b</italic>
</sub> (ω) =1 for dispatchable generators, and A<sub>
 <italic>g,b</italic>
</sub> (ω) &lt; 1 for both intermittent and hydro generators only during dry seasons. </p>
			<p>
				<inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i029.png"/><sub>max</sub> and <inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i030.png"/><sub>min</sub>: are the maximum and minimum operating power limits of each generator, respectively.</p>
			<p>Constraint <xref ref-type="disp-formula" rid="e1">eq. (1)</xref> describes the operational cost of the power system. Constraint <xref ref-type="disp-formula" rid="e2">eq. (2)</xref> represents the power balance constraint under normal and post-contingency operating conditions. Constraint <xref ref-type="disp-formula" rid="e3">eq. (3)</xref> limits power flow on each line under normal and post-contingency operating conditions. Constraint <xref ref-type="disp-formula" rid="e4">eq. (4)</xref> displays the definition of active power flow in terms of voltage angle difference. Constraint <xref ref-type="disp-formula" rid="e5">eq. (5)</xref> shows power output limits of generation. And constraint <xref ref-type="disp-formula" rid="e6">eq. (6)</xref> represents voltage angle limits under normal and post-contingency operating conditions.</p>
		</sec>
		<sec>
			<title>5. LACE formulations</title>
			<p>LACE of a new generation project p, namely LACE<sub>
 <italic>p</italic>
</sub> , is defined as the annual cost change (ΔS<sub>
 <italic>p</italic>
</sub> ) caused by the project per unit of energy (E<sub>
 <italic>p</italic>
</sub> ) it can produce during the year. Thus, LACE can be computed as: </p>
			<p>
				<disp-formula id="e7">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e7.jpg"/>
				</disp-formula>
			</p>
			<p>If ΔS<sub>
 <italic>p</italic> 
</sub> &gt; 0, then it can said that project p replaces expensive generation. If ΔS<sub>
 <italic>p</italic>
</sub> = 0, it can said that the project does not offer any economic or operational advantage. ΔS<sub>
 <italic>p</italic>
</sub> is computed as the average cost change caused by project p with respect to the set of generation scenarios Ω. That is,</p>
			<p>
				<disp-formula id="e8">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e8.jpg"/>
				</disp-formula>
			</p>
			<p>Where w<sub>
 <italic>ω</italic>
</sub> is the weight associated to generation scenario ω. Besides, <inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i033.png"/> represents the resulting operating cost of the system when the generation set considers the new project p, i.e., when set Ψ is changed to <inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i035.png"/>. In this work, annual energy produced by each new generation project p is averaged over the generation scenarios, according to the work of [<xref ref-type="bibr" rid="B20">20</xref>], as <xref ref-type="disp-formula" rid="e9">eq. (9)</xref> shows:</p>
			<p>
				<disp-formula id="e9">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e9.jpg"/>
				</disp-formula>
			</p>
			<p>Where 𝑃 𝑝,𝑏,𝜔 ∗ represents the optimal power dispatched by generation project p in demand block b under generation scenario ω. Finally, LACE can be computed as:</p>
			<p>
				<disp-formula id="e10">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e10.jpg"/>
				</disp-formula>
			</p>
		</sec>
		<sec>
			<title>6. Net Benefit formulations</title>
			<p>Another useful indicator for evaluating generation projects is the Net Benefit (NB). The NB of a project can be calculated by subtraction of investment, operating and administrative costs from the cost savings estimated by avoided costs [<xref ref-type="bibr" rid="B13">13</xref>]. According to [<xref ref-type="bibr" rid="B7">7</xref>], <inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i039.png"/> of project <inline-graphic xlink:href="0012-7353-dyna-85-206-00079-i040.png"/> can be computed as:</p>
			<p>
				<disp-formula id="e11">
					<graphic xlink:href="0012-7353-dyna-85-206-00079-e11.jpg"/>
				</disp-formula>
			</p>
			<p>When LACE<sub>
 <italic>p</italic>
</sub> &gt; LCOE<sub>
 <italic>p</italic>
</sub> , the project is attractive for the planer or investor since its levelized cost savings can cover the levelized cost. Otherwise, the project does not offer attractive features and might not be considered as a real expansion option. In general, the higher NB<sub>
 <italic>p</italic>
</sub> the better.</p>
		</sec>
		<sec sec-type="results">
			<title>7. Numerical results</title>
			<p>Our goal is to illustrate LACE and NB of diverse generation projects located in Colombia, which are listed in <xref ref-type="table" rid="t1">Table 1</xref>. Generation technologies like wind, solar photovoltaic, thermal solar, biomass, hydro, coal, gas, and geothermal of different size were considered. <xref ref-type="table" rid="t1">Table 1</xref> presents the variable operational cost c<sub>
 <italic>p</italic>
</sub> of each new generation project p as well as the connection bus. This data were obtained from [<xref ref-type="bibr" rid="B21">21</xref>].</p>
			<p>
				<table-wrap id="t1">
					<label><bold>Table 1</bold></label>
					<caption>
						<title>Data of the new generation technologies</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-206-00079-gt1.jpg"/>
					<table-wrap-foot>
						<fn id="TFN1">
							<p><bold>Source:</bold> The Authors</p>
						</fn>
					</table-wrap-foot>
				</table-wrap>
			</p>
			<p>The Colombian network employed consists of 1,487 transmission lines and power transformers, 1018 buses, with a total system demand of 9,500 MW, approximately. Currently, hydro-generation represents 69.9 % of the installed capacity and thermal generation about 29.7 % [<xref ref-type="bibr" rid="B22">22</xref>].</p>
			<p>Given the high dependence on hydro power, Colombian power system performance is extremely sensitive to weather fluctuations. Geographic location makes of Colombia a tropical country with only two weather seasons: rainy and dry [<xref ref-type="bibr" rid="B20">20</xref>]. These conditions allow us to construct two extreme scenarios that capture hydro generation variability. Our generation scenario set is Ω={𝐻,𝑇}, where H represents a heavy “hydro” power production scenario (typical during rainy seasons) and T stands for a heavy “thermal” power production scenario (typical during dry seasons).</p>
			<p>Three load blocks were used to model hourly demand variation. These blocks represent peak, medium and minimum demand. According to [<xref ref-type="bibr" rid="B23">23</xref>], in Colombia each block is allocated with 2,190 hours/year in peak demand, which occurs during the evening (18:00 h to 0:00 h), 4,745 hours/year in medium demand, which occurs during the daytime (5:00 h to 18:00 h), and 1,825 hours/year in minimum demand (0:00 h to 5:00 h). In order to consider hourly production variability of wind and solar resources, the availability factor A<sub>
 <italic>g,b</italic>
</sub> (ω) was adjusted accordingly to limit power production in the SCOPF model. The availability A<sub>
 <italic>g,b</italic>
</sub> (ω) used for photovoltaic projects under scenario T during peak, medium and minimum demand was 0, 0.8, and 0 respectively; whereas in scenario H, these factors were 0, 0.1 and 0. In the case of wind projects, availability factors were 0.35, 0.45 and 0.2 for each demand block as previously defined for both scenarios. The optimization model presented in section 4 was implemented in GAMS [<xref ref-type="bibr" rid="B24">24</xref>].</p>
			<p>From <xref ref-type="fig" rid="f1">Figure 1</xref> some key elements can be highlighted: 1) coal and biomass-based power technologies display a remarkable LACE component during peak hours and under scenario T compared to renewable projects. Coal and biomass projects displace the most expensive generation in the north and southwest regions of the country. Moreover, some of coal-based technologies such as Fluidized Bed Pulverized Coal (FBPC) and Conventional Pulverized Coal (CPC) have a considerable LACE during medium demand blocks under scenario T. 2) Photovoltaic, thermal solar, wind and geothermal projects have a significant LACE under T scenario and medium demand block (when wind availability is high). The displacement of fossil fuel-based expensive generation during dry season is the reason of these results. On the contrary, LACE caused by these projects is low under the H scenario given the lower displacement of low-cost hydro generation.</p>
			<p>
				<fig id="f1">
					<label><bold>Figure 1</bold></label>
					<caption>
						<title>LACE under the different generation and load scenarios</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-206-00079-gf1.png"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>
				<xref ref-type="fig" rid="f2">Figure 2</xref> shows results of LACE, LCOE, and NB. LACE is averaged over scenarios H and T. LCOE data were taken from [<xref ref-type="bibr" rid="B4">4</xref>]. The adopted approach is inspired in the work of [<xref ref-type="bibr" rid="B1">1</xref>], which facilitates the incorporation of current policy aspects (taxes, incentives). From <xref ref-type="fig" rid="f2">Figure 2</xref>, it can be seen that the geothermal project GT-SF 50 MW reflects the maximum NB given its high LACE. The high availability factor of this resource, its independence from weather conditions to produce energy, and its null production cost are key factors that justify these results. This is finally reflected in significant cost savings. A similar result is observed in the US according to NB analysis performed in reference [<xref ref-type="bibr" rid="B7">7</xref>]. Intermittent generation like wind, photovoltaic, and thermal solar have a positive value of NB due to great economic competitiveness under scenario T. The project labeled as NGCC 390 MW has a negative NB since its LACE is not as high as its LCOE. This project does not cause any savings under scenario H during minimum load periods.</p>
			<p>
				<fig id="f2">
					<label><bold>Figure 2</bold></label>
					<caption>
						<title>NB, LACE and LCOE of the generation technologies in Colombia</title>
					</caption>
					<graphic xlink:href="0012-7353-dyna-85-206-00079-gf2.png"/>
					<attrib><bold>Source:</bold> The authors.</attrib>
				</fig>
			</p>
			<p>The SCOPF model is useful to detect transmission congestion and security issues due to the occurrence of a specific contingency. In these cases, a specific project, properly located (and not necessarily economic), can improve these security and/or congestion issues. This benefit is ultimately reflected in high LACE. On the contrary, potential operational impact of generation projects on uncongested networks is null. For instance, the installation of the geothermal project GT-SF 50 MW reduced the congestion level on near three-winding transformers under scenario T and peak demand block when the outage of other power transformers was analyzed. The economical and operational advantages of this technology is what makes it valuable.</p>
		</sec>
		<sec sec-type="conclusions">
			<title>8. Conclusions</title>
			<p>This work proposed a novel methodology for computing LACE considering operational aspects. LACE is a useful index to estimate the unit cost savings produced by new generation project. Our LACE approach also captures important operational aspects, needed to be considered for making investment decisions, such as system security under N-1 contingencies or generation support during peak demand periods. By using the SCOPF as an evaluation tool, the proposed LACE model identifies differences between the power output profiles of both intermittent and dispatchable generation. The proposed LACE model also allows capturing energy resources geographical dependence as well as electrical network topology. Additionally, the consideration of different generation scenarios provides better LACE results, since different operating points are captured. Through NB, it was also possible to identify those candidate projects that effectively balance savings and cost. This formulation can provide decision and policy makers with additional tools to better design expansion plans and policies. According to our results, most of all the renewable generation projects display high values of LACE and NB, especially geothermal technology (GT-SF 50MW).</p>
		</sec>
	</body>
	<back>
		<ack>
			<title>Acknowledgments</title>
			<p>The authors want to thank Colciencias and “Unidad de Planeación Minero Energética” for the financial support under contract 589-2013 (convocatoria # 616 de 2013).</p>
		</ack>
		<ref-list>
			<title>References</title>
			<ref id="B1">
				<label>[1]</label>
				<mixed-citation>[1]  Reichelstein, S. and Yorston, M. The prospects for cost competitive solar PV power. Energy Policy, 55(0), pp. 117-127, 2013. DOI: 10.1016/j.enpol.2012.11.003</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Reichelstein</surname>
							<given-names>S.</given-names>
						</name>
						<name>
							<surname>Yorston</surname>
							<given-names>M.</given-names>
						</name>
					</person-group>
					<article-title>The prospects for cost competitive solar PV power</article-title>
					<source>Energy Policy</source>
					<volume>55</volume>
					<issue>0</issue>
					<fpage>117</fpage>
					<lpage>127</lpage>
					<year>2013</year>
					<pub-id pub-id-type="doi">10.1016/j.enpol.2012.11.003</pub-id>
				</element-citation>
			</ref>
			<ref id="B2">
				<label>[2]</label>
				<mixed-citation>[2]  Castillo-Ramírez, A., Mejía-Giraldo, D., and Giraldo-Ocampo, J.D., Geospatial levelized cost of energy in Colombia: GeoLCOE. Paper presented at the Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015, IEEE PES.</mixed-citation>
				<element-citation publication-type="confproc">
					<person-group person-group-type="author">
						<name>
							<surname>Castillo-Ramírez</surname>
							<given-names>A.</given-names>
						</name>
						<name>
							<surname>Mejía-Giraldo</surname>
							<given-names>D.</given-names>
						</name>
						<name>
							<surname>Giraldo-Ocampo</surname>
							<given-names>J.D.</given-names>
						</name>
					</person-group>
					<source>Geospatial levelized cost of energy in Colombia: GeoLCOE</source>
					<conf-name>Innovative Smart Grid Technologies Latin America (ISGT LATAM)</conf-name>
					<conf-date>2015</conf-date>
					<conf-sponsor>IEEE</conf-sponsor>
				</element-citation>
			</ref>
			<ref id="B3">
				<label>[3]</label>
				<mixed-citation>[3]  Castillo-Ramírez, A., Mejía-Giraldo, D. and Molina-Castro, J., Fiscal Incentives impact for ret's investments in Colombia. Energy Sources, Part B: Economics, Planning and Policy. [online]. pp. 759-764, 2017. Avilable at: <ext-link ext-link-type="uri" xlink:href="http://www.tandfonline.com/doi/abs/10.1080/15567249.2016.1276648">http://www.tandfonline.com/doi/abs/10.1080/15567249.2016.1276648</ext-link>
				</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Castillo-Ramírez</surname>
							<given-names>A.</given-names>
						</name>
						<name>
							<surname>Mejía-Giraldo</surname>
							<given-names>D.</given-names>
						</name>
						<name>
							<surname>Molina-Castro</surname>
							<given-names>J.</given-names>
						</name>
					</person-group>
					<article-title>Fiscal Incentives impact for ret's investments in Colombia</article-title>
					<source>Energy Sources, Part B: Economics, Planning and Policy</source>
					<fpage>759</fpage>
					<lpage>764</lpage>
					<year>2017</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.tandfonline.com/doi/abs/10.1080/15567249.2016.1276648">http://www.tandfonline.com/doi/abs/10.1080/15567249.2016.1276648</ext-link>
				</element-citation>
			</ref>
			<ref id="B4">
				<label>[4]</label>
				<mixed-citation>[4]  GIMEL. Costos nivelados de generación de electricidad en Colombia-generalidades: GIMEL-Universidad de Antioquia, Colombia, [en línea]. 2015. Disponible en: <ext-link ext-link-type="uri" xlink:href="http://www.siel.gov.co/Inicio/Generaci%C3%B3n/Estudiodecostosniveladosdegeneracion/tabid/157/Default.aspx">http://www.siel.gov.co/Inicio/Generaci%C3%B3n/Estudiodecostosniveladosdegeneracion/tabid/157/Default.aspx</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>GIMEL</collab>
					</person-group>
					<source>Costos nivelados de generación de electricidad en Colombia-generalidades</source>
					<publisher-name>GIMEL-Universidad de Antioquia</publisher-name>
					<publisher-loc>Colombia</publisher-loc>
					<year>2015</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.siel.gov.co/Inicio/Generaci%C3%B3n/Estudiodecostosniveladosdegeneracion/tabid/157/Default.aspx">http://www.siel.gov.co/Inicio/Generaci%C3%B3n/Estudiodecostosniveladosdegeneracion/tabid/157/Default.aspx</ext-link>
				</element-citation>
			</ref>
			<ref id="B5">
				<label>[5]</label>
				<mixed-citation>[5]  Larsson, S., Reviewing electricity generation cost assessments, MSc. Thesis, Disciplinary domain of science and technology, earth sciences, department of earth sciences, Uppsala University, Sweden, [online]. 2012. Available at: <ext-link ext-link-type="uri" xlink:href="http://www.diva-portal.org/smash/get/diva2:540350/FULLTEXT02">http://www.diva-portal.org/smash/get/diva2:540350/FULLTEXT02</ext-link>
				</mixed-citation>
				<element-citation publication-type="thesis">
					<person-group person-group-type="author">
						<name>
							<surname>Larsson</surname>
							<given-names>S.</given-names>
						</name>
					</person-group>
					<source>Reviewing electricity generation cost assessments</source>
					<comment content-type="degree">MSc.</comment>
					<publisher-name>department of earth sciences, Uppsala University</publisher-name>
					<publisher-loc>Sweden</publisher-loc>
					<year>2012</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.diva-portal.org/smash/get/diva2:540350/FULLTEXT02">http://www.diva-portal.org/smash/get/diva2:540350/FULLTEXT02</ext-link>
				</element-citation>
			</ref>
			<ref id="B6">
				<label>[6]</label>
				<mixed-citation>[6]  Joskow, P.L., Comparing the costs of intermittent and dispatchable electricity generating technologies. American Economic Association, [online]. 101(3), pp. 4, 2011. Available at: <ext-link ext-link-type="uri" xlink:href="http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.227.6392&amp;rep=rep1&amp;type=pdf">http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.227.6392&amp;rep=rep1&amp;type=pdf</ext-link>
				</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Joskow</surname>
							<given-names>P.L.</given-names>
						</name>
					</person-group>
					<article-title>Comparing the costs of intermittent and dispatchable electricity generating technologies</article-title>
					<source>American Economic Association</source>
					<volume>101</volume>
					<issue>3</issue>
					<fpage>4</fpage>
					<lpage>4</lpage>
					<year>2011</year>
					<ext-link ext-link-type="uri" xlink:href="http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.227.6392&amp;rep=rep1&amp;type=pdf">http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.227.6392&amp;rep=rep1&amp;type=pdf</ext-link>
				</element-citation>
			</ref>
			<ref id="B7">
				<label>[7]</label>
				<mixed-citation>[7]  Energy Information Adminsitration (EIA). Levelized cost and levelized avoided cost of new generation resources in the Annual Energy Outlook 2016: U.S, 2016.</mixed-citation>
				<element-citation publication-type="confproc">
					<person-group person-group-type="author">
						<collab>Energy Information Adminsitration</collab>
					</person-group>
					<source>Levelized cost and levelized avoided cost of new generation resources</source>
					<conf-name>Annual Energy Outlook</conf-name>
					<conf-date>2016</conf-date>
					<conf-loc>U.S</conf-loc>
					<year>2016</year>
				</element-citation>
			</ref>
			<ref id="B8">
				<label>[8]</label>
				<mixed-citation>[8]  Shalaby, A., Avoided costs: Ontario Hydro's experience. Power Systems, IEEE Transactions on, 4(1), pp. 149-157, 1989. DOI: 10.1109/59.32472</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Shalaby</surname>
							<given-names>A.</given-names>
						</name>
					</person-group>
					<article-title>Avoided costs: Ontario Hydro's experience</article-title>
					<source>Power Systems, IEEE Transactions on</source>
					<volume>4</volume>
					<issue>1</issue>
					<fpage>149</fpage>
					<lpage>157</lpage>
					<year>1989</year>
					<pub-id pub-id-type="doi">10.1109/59.32472</pub-id>
				</element-citation>
			</ref>
			<ref id="B9">
				<label>[9]</label>
				<mixed-citation>[9]  Inter-American Development Bank (IADB). Societal benefits from renewable energy in Latin America and the Caribbean (E. Division, Trans.): Inter American Development Bank: Climate Change and Sustainability Division, [online]. 2014. Available at: <ext-link ext-link-type="uri" xlink:href="https://publications.iadb.org/bitstream/handle/11319/6034/Societal%20benefits%20TN-623.pdf?sequence=1">https://publications.iadb.org/bitstream/handle/11319/6034/Societal%20benefits%20TN-623.pdf?sequence=1</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>Inter-American Development Bank</collab>
					</person-group>
					<source>Societal benefits from renewable energy in Latin America and the Caribbean</source>
					<publisher-name>Inter American Development Bank</publisher-name>
					<year>2014</year>
					<ext-link ext-link-type="uri" xlink:href="https://publications.iadb.org/bitstream/handle/11319/6034/Societal%20benefits%20TN-623.pdf?sequence=1">https://publications.iadb.org/bitstream/handle/11319/6034/Societal%20benefits%20TN-623.pdf?sequence=1</ext-link>
				</element-citation>
			</ref>
			<ref id="B10">
				<label>[10]</label>
				<mixed-citation>[10]  Synapse Energy Economics, Inc. Avoided energy supply costs in New England: 2013 Report, U.S, [online]. 2013, 289 P. Available at: <ext-link ext-link-type="uri" xlink:href="http://www.synapseenergy.com/sites/default/files/SynapseReport.2013-07.AESC_.AESC-2013.13-029-Report.pdf">http://www.synapseenergy.com/sites/default/files/SynapseReport.2013-07.AESC_.AESC-2013.13-029-Report.pdf</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>Synapse Energy Economics, Inc</collab>
					</person-group>
					<source>Avoided energy supply costs in New England: 2013 Report</source>
					<publisher-loc>U.S</publisher-loc>
					<year>2013</year>
					<size units="pages">289</size>
					<ext-link ext-link-type="uri" xlink:href="http://www.synapseenergy.com/sites/default/files/SynapseReport.2013-07.AESC_.AESC-2013.13-029-Report.pdf">http://www.synapseenergy.com/sites/default/files/SynapseReport.2013-07.AESC_.AESC-2013.13-029-Report.pdf</ext-link>
				</element-citation>
			</ref>
			<ref id="B11">
				<label>[11]</label>
				<mixed-citation>[11]  Energy and Environmental Economics, Inc. Methodology and forecast of long term avoided costs for the evaluation of California Energy Efficiency Programs, Rocky Mountain Institute, Snowmass, Colorado, U.S, 2004, 279 P.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>Energy and Environmental Economics, Inc.</collab>
					</person-group>
					<source>Methodology and forecast of long term avoided costs for the evaluation of California Energy Efficiency Programs</source>
					<publisher-name>Rocky Mountain Institute</publisher-name>
					<year>2004</year>
					<size units="pages">279</size>
				</element-citation>
			</ref>
			<ref id="B12">
				<label>[12]</label>
				<mixed-citation>[12]  Exeter Associates, Inc. Avoided energy costs in Maryland- assessment of the costs avoided through energy efficiency and conservation measures in Maryland, U.S, 2014.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>Exeter Associates, Inc.</collab>
					</person-group>
					<source>Avoided energy costs in Maryland- assessment of the costs avoided through energy efficiency and conservation measures in Maryland</source>
					<publisher-loc>U.S</publisher-loc>
					<year>2014</year>
				</element-citation>
			</ref>
			<ref id="B13">
				<label>[13]</label>
				<mixed-citation>[13]  Beeche, J.A., Avoided cost: an essential concept for integrated resource planning. Center for Urban Policy and the Environment, Indiana University-Purdue University, Indianapolis, U.S, [online] 1996. Available at: <ext-link ext-link-type="uri" xlink:href="http://opensiuc.lib.siu.edu/cgi/viewcontent.cgi?article=1321&amp;context=jcwre">http://opensiuc.lib.siu.edu/cgi/viewcontent.cgi?article=1321&amp;context=jcwre</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Beeche</surname>
							<given-names>J.A.</given-names>
						</name>
					</person-group>
					<source>Avoided cost: an essential concept for integrated resource planning</source>
					<publisher-name>Indiana University</publisher-name>
					<publisher-name>Purdue University</publisher-name>
					<publisher-loc>Indianapolis</publisher-loc>
					<year>1996</year>
					<ext-link ext-link-type="uri" xlink:href="http://opensiuc.lib.siu.edu/cgi/viewcontent.cgi?article=1321&amp;context=jcwre">http://opensiuc.lib.siu.edu/cgi/viewcontent.cgi?article=1321&amp;context=jcwre</ext-link>
				</element-citation>
			</ref>
			<ref id="B14">
				<label>[14]</label>
				<mixed-citation>[14]  Elefant, C., Reviving purpa’s purpose: the limits of existing state avoided cost ratemaking methodologies in supporting alternative energy development and a proposed path for reform, U.S, [online]. 2011. Avalaible at: <ext-link ext-link-type="uri" xlink:href="http://www.recycled-energy.com/images/uploads/Reviving-PURPA.pdf">http://www.recycled-energy.com/images/uploads/Reviving-PURPA.pdf</ext-link>
				</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<name>
							<surname>Elefant</surname>
							<given-names>C.</given-names>
						</name>
					</person-group>
					<source>Reviving purpa’s purpose: the limits of existing state avoided cost ratemaking methodologies in supporting alternative energy development and a proposed path for reform, U.S</source>
					<year>2011</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.recycled-energy.com/images/uploads/Reviving-PURPA.pdf">http://www.recycled-energy.com/images/uploads/Reviving-PURPA.pdf</ext-link>
				</element-citation>
			</ref>
			<ref id="B15">
				<label>[15]</label>
				<mixed-citation>[15]  Busch, J.F. and Eto, J., Estimation of avoided costs for electric utility demand-side planning. Energy Sources, 18(4), pp. 473-499, 1996. DOI: 10.1080/00908319608908783</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Busch</surname>
							<given-names>J.F.</given-names>
						</name>
						<name>
							<surname>Eto</surname>
							<given-names>J.</given-names>
						</name>
					</person-group>
					<article-title>Estimation of avoided costs for electric utility demand-side planning</article-title>
					<source>Energy Sources</source>
					<volume>18</volume>
					<issue>4</issue>
					<fpage>473</fpage>
					<lpage>499</lpage>
					<year>1996</year>
					<pub-id pub-id-type="doi">10.1080/00908319608908783</pub-id>
				</element-citation>
			</ref>
			<ref id="B16">
				<label>[16]</label>
				<mixed-citation>[16]  Capitanescu, F., Glavic, M., Ernst, D. and Wehenkel, L., Applications of security-constrained optimal power flow, Modern Electric Power Systems Symposium, MEPS06, [online]. 2006. Available at: <ext-link ext-link-type="uri" xlink:href="http://orbi.ulg.ac.be/handle/2268/13538">http://orbi.ulg.ac.be/handle/2268/13538</ext-link>
				</mixed-citation>
				<element-citation publication-type="confproc">
					<person-group person-group-type="author">
						<name>
							<surname>Capitanescu</surname>
							<given-names>F.</given-names>
						</name>
						<name>
							<surname>Glavic</surname>
							<given-names>M.</given-names>
						</name>
						<name>
							<surname>Ernst</surname>
							<given-names>D.</given-names>
						</name>
						<name>
							<surname>Wehenkel</surname>
							<given-names>L.</given-names>
						</name>
					</person-group>
					<source>Applications of security-constrained optimal power flow</source>
					<conf-name>Modern Electric Power Systems Symposium, MEPS06</conf-name>
					<year>2006</year>
					<ext-link ext-link-type="uri" xlink:href="http://orbi.ulg.ac.be/handle/2268/13538">http://orbi.ulg.ac.be/handle/2268/13538</ext-link>
				</element-citation>
			</ref>
			<ref id="B17">
				<label>[17]</label>
				<mixed-citation>[17]  Phan, D. and Kalagnanam, J., Some efficient optimization methods for solving the security-constrained optimal power flow problem. IEEE Transactions on Power Systems, 29(2), pp. 863-872, 2014. DOI: 10.1109/TPWRS.2013.2283175</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Phan</surname>
							<given-names>D.</given-names>
						</name>
						<name>
							<surname>Kalagnanam</surname>
							<given-names>J.</given-names>
						</name>
					</person-group>
					<article-title>Some efficient optimization methods for solving the security-constrained optimal power flow problem</article-title>
					<source>IEEE Transactions on Power Systems</source>
					<volume>29</volume>
					<issue>2</issue>
					<fpage>863</fpage>
					<lpage>872</lpage>
					<year>2014</year>
					<pub-id pub-id-type="doi">10.1109/TPWRS.2013.2283175</pub-id>
				</element-citation>
			</ref>
			<ref id="B18">
				<label>[18]</label>
				<mixed-citation>[18]  Bhaskar-M, M., Srinivas, M. and Sydulu, M., Security constraint optimal power flow (SCOPF) - A comprehensive survey, International Journal of Computer Applications, 11(6), [online]. 2010. Available at: <ext-link ext-link-type="uri" xlink:href="http://www.ijcaonline.org/archives/volume11/number6/1583-2122">http://www.ijcaonline.org/archives/volume11/number6/1583-2122</ext-link> DOI: 10.5120/1583-2122</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Bhaskar-M</surname>
							<given-names>M.</given-names>
						</name>
						<name>
							<surname>Srinivas</surname>
							<given-names>M.</given-names>
						</name>
						<name>
							<surname>Sydulu</surname>
							<given-names>M.</given-names>
						</name>
					</person-group>
					<article-title>Security constraint optimal power flow (SCOPF) - A comprehensive survey</article-title>
					<source>International Journal of Computer Applications</source>
					<volume>11</volume>
					<issue>6</issue>
					<year>2010</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.ijcaonline.org/archives/volume11/number6/1583-2122">http://www.ijcaonline.org/archives/volume11/number6/1583-2122</ext-link>
					<pub-id pub-id-type="doi">10.5120/1583-2122</pub-id>
				</element-citation>
			</ref>
			<ref id="B19">
				<label>[19]</label>
				<mixed-citation>[19]  CREG 025. Comision de Regulación de Energia y Gas. Por la cual se establece el Código de Redes, como parte del Reglamento de Operación del Sistema Interconectado Nacional, Colombia, [en línea]. 1995. Dsponible en: <ext-link ext-link-type="uri" xlink:href="http://apolo.creg.gov.co/Publicac.nsf/2b8fb06f012cc9c245256b7b00789b0c/3a940408d14bf2e80525785a007a653b/$FILE/Cr025-95.pdf">http://apolo.creg.gov.co/Publicac.nsf/2b8fb06f012cc9c245256b7b00789b0c/3a940408d14bf2e80525785a007a653b/$FILE/Cr025-95.pdf</ext-link>
				</mixed-citation>
				<element-citation publication-type="legal-doc">
					<source>CREG 025. Comision de Regulación de Energia y Gas. Por la cual se establece el Código de Redes, como parte del Reglamento de Operación del Sistema Interconectado Nacional, Colombia</source>
					<year>1995</year>
					<ext-link ext-link-type="uri" xlink:href="http://apolo.creg.gov.co/Publicac.nsf/2b8fb06f012cc9c245256b7b00789b0c/3a940408d14bf2e80525785a007a653b/$FILE/Cr025-95.pdf">http://apolo.creg.gov.co/Publicac.nsf/2b8fb06f012cc9c245256b7b00789b0c/3a940408d14bf2e80525785a007a653b/$FILE/Cr025-95.pdf</ext-link>
				</element-citation>
			</ref>
			<ref id="B20">
				<label>[20]</label>
				<mixed-citation>[20]  Correa-Metrio, A., El cambio climático y el invierno en Colombia: Un juego de niñas y niños. Universo Centro, [en línea]. 21, 2011. Disponible en: <ext-link ext-link-type="uri" xlink:href="http://www.universocentro.com/NUMERO21/ElcambioclimáticoyelinviernoenColombia.aspx">http://www.universocentro.com/NUMERO21/ElcambioclimáticoyelinviernoenColombia.aspx</ext-link>
				</mixed-citation>
				<element-citation publication-type="journal">
					<person-group person-group-type="author">
						<name>
							<surname>Correa-Metrio</surname>
							<given-names>A.</given-names>
						</name>
					</person-group>
					<article-title>El cambio climático y el invierno en Colombia: Un juego de niñas y niños</article-title>
					<source>Universo Centro</source>
					<issue>21</issue>
					<year>2011</year>
					<ext-link ext-link-type="uri" xlink:href="http://www.universocentro.com/NUMERO21/ElcambioclimáticoyelinviernoenColombia.aspx">http://www.universocentro.com/NUMERO21/ElcambioclimáticoyelinviernoenColombia.aspx</ext-link>
				</element-citation>
			</ref>
			<ref id="B21">
				<label>[21]</label>
				<mixed-citation>[21]  Expertos en mercado-precios de oferta inicial (XM), [en línea]. 2016. [Consultado en: marzo 16 de 2016]. Disponible en: <comment>Disponible en: <ext-link ext-link-type="uri" xlink:href="http://www.xm.com.co/Pages/PreciodeOfertaInicial.aspx">http://www.xm.com.co/Pages/PreciodeOfertaInicial.aspx</ext-link>
					</comment>
				</mixed-citation>
				<element-citation publication-type="book">
					<source>Expertos en mercado-precios de oferta inicial (XM)</source>
					<year>2016</year>
					<date-in-citation content-type="access-date" iso-8601-date="2016-03-16">marzo 16 de 2016</date-in-citation>
					<comment>Disponible en: <ext-link ext-link-type="uri" xlink:href="http://www.xm.com.co/Pages/PreciodeOfertaInicial.aspx">http://www.xm.com.co/Pages/PreciodeOfertaInicial.aspx</ext-link>
					</comment>
				</element-citation>
			</ref>
			<ref id="B22">
				<label>[22]</label>
				<mixed-citation>[22]  UPME. Unidad de Planeación Minero - Energética. Estudio de generacion electrica bajo escenario de cambio climatico: Unidad de Planeación Minero Energética, Colombia, 2017.</mixed-citation>
				<element-citation publication-type="book">
					<person-group person-group-type="author">
						<collab>Unidad de Planeación Minero - Energética</collab>
					</person-group>
					<source>Estudio de generacion electrica bajo escenario de cambio climatico</source>
					<publisher-name>Unidad de Planeación Minero Energética</publisher-name>
					<publisher-loc>Colombia</publisher-loc>
					<year>2017</year>
				</element-citation>
			</ref>
			<ref id="B23">
				<label>[23]</label>
				<mixed-citation>[23]  CREG 011. Comision de Regulación de Energia y Gas. Por la cual se establece la metodologia y formulas tarifarias para la remuneracion de la actividad de la tranmision de energia electrica en el STN, Colombia, 2009.</mixed-citation>
				<element-citation publication-type="legal-doc">
					<source>CREG 011. Comision de Regulación de Energia y Gas. Por la cual se establece la metodologia y formulas tarifarias para la remuneracion de la actividad de la tranmision de energia electrica en el STN, Colombia</source>
					<year>2009</year>
				</element-citation>
			</ref>
			<ref id="B24">
				<label>[24]</label>
				<mixed-citation>[24]  General Algebraic Modeling System. GAMS Development Corporation, Washington DC, USA, 2017. [Online]. Avalaible at: <ext-link ext-link-type="uri" xlink:href="https://www.gams.com/">https://www.gams.com/</ext-link>
				</mixed-citation>
				<element-citation publication-type="software">
					<source>General Algebraic Modeling System</source>
					<publisher-name>GAMS Development Corporation</publisher-name>
					<publisher-loc>Washington DC</publisher-loc>
					<year>2017</year>
					<ext-link ext-link-type="uri" xlink:href="https://www.gams.com/">https://www.gams.com/</ext-link>
				</element-citation>
			</ref>
		</ref-list>
		<fn-group>
			<fn fn-type="other" id="fn0">
				<label>How to cite:</label>
				<p> Marín-Cano, C.C. and Mejía-Giraldo, D.A., Levelized avoided cost of electricity model based on power system operation. DYNA, 85(206), pp. 79-84, September, 2018.</p>
			</fn>
		</fn-group>
		<fn-group>
			<fn fn-type="other" id="fn1">
				<label>C.C. Marín-Cano,</label>
				<p> received the BSc. Eng in Electrical Engineering in 2010, and currently is pursuing the MSc. degree in Engineering, in Universidad de Antioquia, Medellin, Colombia. From 2010 to 2014, he worked for electricity utilities and consulting companies within the power sector. Currently, he is working as auxiliary researcher in GIMEL research group of Universidad de Antioquia and also as freelance consultant. His research interests include: simulation, modeling, and optimization in electrical systems. ORCID: 0000-0002-8235-4659</p>
			</fn>
			<fn fn-type="other" id="fn2">
				<label>D.A. Mejía-Giraldo,</label>
				<p> received the BSc. and MSc. degrees in Electrical Engineering from Universidad Tecnológica de Pereira, Pereira, Colombia, in 2004 and 2005, respectively, and the PhD. degree in Electrical Engineering from Iowa State University, Ames, IA, USA, 2013. In 2013, he worked as an intern at XM, Colombian ISO, within the long term energy planning team. He is an Assistant Professor of Electrical Engineering for Universidad de Antioquia, Medellin, Colombia. ORCID: 0000-0001-9287-4810</p>
			</fn>
		</fn-group>
	</back>
</article>