Levelized avoided cost of electricity model based on power system operation

Modelo de costo evitado nivelado de electricidad basado en la operación del sistema de potencia

Palabras clave:

levelized costs of Electricity, avoided costs of electricity, generation expansion planning, power system optimization, security-constrained optimal power flow (en)
costo nivelado de electricidad, costo evitado de electricidad, planeación de expansión de generación, optimización de sistemas de potencia, flujo óptimo de potencia con restricciones de seguridad (es)

Autores/as

This paper presents a methodology to estimate the Levelized Avoided Cost of Electricity (LACE) of new generation projects based on the assessment of economic and operational benefits perceived by an existing power system. The marginal economic benefit caused by the integration of a new generation project is captured using the Differential Revenue Requirement method (DRR); whereas the operational benefits are observed by analyzing the performance of the new project through a preventive DC Security-Constrained Optimal Power Flow (SCOPF) tool. The SCOPF also allows quantifying economic benefits due to replacement of expensive generation, transmission congestion, and N-1 security improvement. Additionally, another metric, called Net Benefit (NB) of a generation project, expressed as the difference between LACE and LCOE (Levelized Cost of Electricity) is also employed in this work. It provides a realistic, easy-to-compute, and intuitive index that helps identifying the most promising generation projects during system expansion planning procedures. Finally, the proposed methodology is applied for computing LACE and NB of different generation projects in Colombia. According to the results, geothermal projects display the most significant LACE and NB. These metrics (LACE and NB) can become useful tools for decision-making in planning process.
Este artículo propone una metodología para estimar el Costo Evitado Nivelado de Electricidad (LACE) de nuevos proyectos de generación basados en la evaluación de beneficios económicos y operacionales, percibidos por un sistema de potencia existente. El beneficio económico marginal causado por la integración de un nuevo proyecto de generación es capturado usando el método Requerimiento de Ingreso Diferencial (DRR); mientras los beneficios operacionales son observados al analizar el desempeño del nuevo proyecto de generación a través un Flujo de Potencia Óptimo DC con Restricciones de Seguridad (SCOPF). SCOPF además permite cuantificar beneficios económicos debido al reemplazo de generación costosa, congestión de la transmisión y mejoramiento de la seguridad N-1. Adicionalmente, en este trabajo se emplea otra métrica, llamada Beneficio Neto (NB) de un proyecto de generación, expresado como la diferencia entre LACE y LCOE (Costo Nivelado de Electricidad). NB proporciona un índice intuitivo, realista y fácil de calcular, que ayuda a identificar los proyectos de generación más promisorios durante los procesos de planeación de la expansión del sistema. Finalmente, la metodología propuesta es aplicada para calcular LACE y NBde diferentes proyectos de generación en Colombia. De acuerdo a los resultados, los proyectos geotérmicos muestran los LACE y NB más significantes. Estas métricas (LACE y NB) pueden llegar a ser útiles herramientas para la toma de decisiones en procesos de planeación.

Descargas

Los datos de descargas todavía no están disponibles.

Citas

Reichelstein, S. and Yorston, M. The prospects for cost competitive solar PV power. Energy Policy, 55(0), pp. 117-127, 2013. DOI: 10.1016/j.enpol.2012.11.003

Castillo-Ramírez, A., Mejía-Giraldo, D.,a,G. and Giraldo-Ocampo, J.D., Geospatial levelized cost of energy in Colombia: GeoLCOE. Paper presented at the Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015, IEEE PES.

Castillo-Ramírez, A., Mejía-Giraldo, D. and Molina-Castro, J., Fiscal Incentives impact for ret's investments in Colombia. Energy Sources, Part B: Economics, Planning and Policy. [online]. pp. 759-764, 2017. Avilable at: http://www.tandfonline.com/doi/abs/10.1080/ 15567249.2016.1276648

GIMEL. Costos nivelados de generación de electricidad en Colombia-generalidades: GIMEL-Universidad de Antioquia, Colombia, [en línea]. 2015. Disponible en: http://www.siel.gov.co/Inicio/Generaci% C3%B3n/Estudiodecostosniveladosdegeneracion/tabid/157/Default.aspx

Larsson, S., Reviewing electricity generation cost assessments, MSc. Thesis, Disciplinary domain of science and technology, earth sciences, department of earth sciences, Uppsala University, Sweden, [online]. 2012. Available at: http://www.diva-portal.org/ smash/get/diva2:540350/FULLTEXT02

Joskow, P.L., Comparing the costs of intermittent and dispatchable electricity generating technologies. American Economic Association, [online]. 101(3), pp. 4, 2011. Available at: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.227.6392&rep=rep1&type=pdf

Energy Information Adminsitration (EIA). Levelized cost and levelized avoided cost of new generation resources in the Annual Energy Outlook 2016: U.S, 2016.

Shalaby, A., Avoided costs: Ontario Hydro's experience. Power Systems, IEEE Transactions on, 4(1), pp. 149-157, 1989. DOI: 10.1109/59.32472

Inter-American Development Bank (IADB). Societal benefits from renewable energy in Latin America and the Caribbean (E. Division, Trans.): Inter American Development Bank: Climate Change and Sustainability Division, [online]. 2014. Available at: https://publications.iadb.org/bitstream/handle/11319/6034/Societal%20benefits%20TN-623.pdf?sequence=1

Synapse Energy Economics, Inc. Avoided energy supply costs in New England: 2013 Report, U.S, [online]. 2013, 289 P. Available at: http://www.synapseenergy.com/sites/default/files/SynapseReport.2013-07.AESC_.AESC-2013.13-029-Report.pdf

Energy and Environmental Economics, Inc. Methodology and forecast of long term avoided costs for the evaluation of California Energy Efficiency Programs, Rocky Mountain Institute, Snowmass, Colorado, U.S, 2004, 279 P.

Exeter Associates, Inc. Avoided energy costs in Maryland- assessment of the costs avoided through energy efficiency and conservation measures in Maryland, U.S, 2014.

Beeche, J.A., Avoided cost: an essential concept for integrated resource planning. Center for Urban Policy and the Environment, Indiana University-Purdue University, Indianapolis, U.S, [online] 1996. Available at: http://opensiuc.lib.siu.edu/cgi/viewcontent. cgi?article=1321&context=jcwre

Elefant, C., Reviving purpa’s purpose: the limits of existing state avoided cost ratemaking methodologies in supporting alternative energy development and a proposed path for reform, U.S, [online]. 2011. Avalaible at: http://www.recycled-energy.com/images/ uploads/Reviving-PURPA.pdf

Busch, J.F. and Eto, J., Estimation of avoided costs for electric utility demand-side planning. Energy Sources, 18(4), pp. 473-499, 1996. DOI: 10.1080/00908319608908783

Capitanescu, F., Glavic, M., Ernst, D. and Wehenkel, L., Applications of security-constrained optimal power flow, Modern Electric Power Systems Symposium, MEPS06, [online]. 2006. Available at: http://orbi.ulg.ac.be/handle/2268/13538

Phan, D. and Kalagnanam, J., Some efficient optimization methods for solving the security-constrained optimal power flow problem. IEEE

Transactions on Power Systems, 29(2), pp. 863-872, 2014. DOI: 10.1109/TPWRS.2013.2283175

Bhaskar-M, M., Srinivas, M. and Sydulu, M., Security constraint optimal power flow (SCOPF) – A comprehensive survey, 11(6), International Journal of Computer Applications, [online]. 2010. Available at: http://www.ijcaonline.org/archives/volume11/number6/ 1583-2122 DOI: 10.5120/1583-2122

CREG 025. Comision de Regulación de Energia y Gas. Por la cual se establece el Código de Redes, como parte del Reglamento de Operación del Sistema Interconectado Nacional, Colombia, [en línea]. 1995. Dsponible en: http://apolo.creg.gov.co/Publicac.nsf/ 2b8fb06f012cc9c245256b7b00789b0c/3a940408d14bf2e80525785a007a653b/$FILE/Cr025-95.pdf

Correa-Metrio, A., El cambio climático y el invierno en Colombia: Un juego de niñas y niños. Universo Centro, [en línea]. 21, 2011. Disponible en: http://www.universocentro.com/NUMERO21/ ElcambioclimáticoyelinviernoenColombia.aspx

Expertos en mercado-precios de oferta inicial (XM), [en línea]. 2016. [Consultado en: marzo 16 de 2016]. Disponible en: http://www.xm.com.co/Pages/PreciodeOfertaInicial.aspx

UPME. Unidad de Planeación Minero - Energética. Estudio de generacion electrica bajo escenario de cambio climatico: Unidad de Planeación Minero Energética, Colombia, 2017.

CREG 011. Comision de Regulación de Energia y Gas. Por la cual se establece la metodologia y formulas tarifarias para la remuneracion de la actividad de la tranmision de energia electrica en el STN, Colombia, 2009.

General Algebraic Modeling System. GAMS Development Corporation, Washington DC, USA, 2017. [Online]. Avalaible at: https://www.gams.com/