Publicado

2008-11-01

Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time

Estimación de predictor para el tiempo de parada del mantenimiento correctivo usando regresión lineal múltiple

Palabras clave:

Maintenance, regression analysis, biomedical technology, decision support system, management (en)
Mantenimiento, estadística y datos numéricos, gerencia (es)

Descargas

Autores/as

  • Antonio M. Cruz Escuela de Medicina, Universidad del Rosario. Bogota D.C., Colombia.
  • Cameron Barr Freelance writer
  • Elsa Puñales-Pozo Clinical Engineering Department at "Cira García" Hospital, Havana, Cuba.

Objectives. This research's main goals were to build a predictor for a turnaround time (TAT) indicator for estimating its values and use a numerical clustering technique for finding possible causes of undesirable TAT values.
Materials and methods. The following stages were used: domain understanding, data characterisation and sample reduction and insight characterisation. Building the TAT indicator multiple linear regression predictor and clustering techniques were used for improving corrective maintenance task efficiency in a clinical engineering department (CED). The indicator being studied was turnaround time (TAT).
Results. Multiple linear regression was used for building a predictive TAT value model. The variables contributing to such model were clinical engineering department response time (CErt, 0.415 positive coefficient), stock service response time (Stockrt, 0.734 positive coefficient), priority level (0.21 positive coefficient) and service time (0.06 positive coefficient). The regression process showed heavy reliance on Stockrt, CErt and priority, in that order. Clustering techniques revealed the main causes of high TAT values.
Conclusions. This examination has provided a means for analysing current technical service quality and effectiveness. In doing so, it has demonstrated a process for identifying areas and methods of improvement and a model against which to analyse these methods' effectiveness.

Objetivos. Construir un predictor que permita estimar los valores de tiempo de cambio de estado (del ingles TAT) y usar técnicas de conglomerados para encontrar las posibles causas de los valores no deseados de TAT.
Materiales y Métodos. Para llevar a cabo esta investigación se realizaron los siguientes pasos: Selección, reducción y caracterización de los datos contenidos en la base de datos bajo estudio y Construcción del Indicador bajo estudio. El indicador bajo estudio fue el tiempo de cambio de estado (por sus siglas en inglés TAT).
Resultados. Se construyó el nuevo predictor para TAT basado en técnicas de regresión múltiple. Las variables que más contribuyeron a la construcción del nuevo predictor fueron tiempo de respuesta del departamento de IC (CErt), con un coeficiente 0,415 positivo, tiempo de respuesta de entrega de las piezas de repuesto (Stockrt), con un coeficiente de 0,734 positivo, nivel de prioridad del equipamiento (RL), con un coeficiente de 0,25 positivo, y tiempo de servicio de mantenimiento (ST), con un coeficiente de 0.06 positivo. La tecnica de regresión aplicada demostró una fuerte dependencia de las variables Stockrt, CErt, y PL en este orden. Las técnicas de conglomerados encontró las principales causas por las cuales el valor de TAT era demasiado alto.
Conclusiones. El estudio demostró que es posible aplicar técnicas de minerías de datos para mejorar la eficiencia de las actividades que se desarrollan en los departamentos de Ingeniería de los hospitales.

Referencias

Two Crows Corporation. Introduction to Data Mining and Knowledge Discovery, 3rd Ed., Maryland, 1999. [Internet] Available at http://www.twocrows.com/intro-dm.pdf (browsing February 2002)

Smola A.J., Scholkopf B. A. Tutorial on Support Vector Regression, NeuroCOLT2 Technical Report Series, 1998, NC2-TR-1998-030.

Muller KR A, Smola G, Ruatsch B, Schoolkopf J, Kohlmorgen, Vapnik V. Predicting time series with support vector machines, In: Gerstner W, Germond A, Hasler M ,Nicoud JD, editors, Artificial Neural Networks, ICANN '97, Springer Lecture Notes in Computer Science Vol. 1327, 1997.

Belouadah H, Potts CN. Scheduling Identical Parallel Machine to Minimize Total Weighted Completion Time. Discrete Applied Mathematics 1995; 48:201-218.

Gelly S, Mary J, Teytaud O. Learning for stochastic dynamic programming. [Internet] Available at http://opendp.sourceforge.net (browsing February 2002)

Press WH, Teukolosky SA, Vetterling WT. Numerical Recipes in C: The Art of Scientific Computing. Cambridge, 1996, UK: Cambridge University Press.

Miguel CA, Rodriguez ED, Caridad SV MC, Gonzales LM. An event-tree-based mathematical formula for the removal of biomedical equipment from a hospital inventory. Journal of Clinical Engineering 2002; Winter:39.

Miguel CA, Rodriguez ED, Caridad SV, Measured effects of user and clinical engineering training using a queuing model. Biomedical Instrumentation and Technology 2003; 37:3.

Cómo citar

APA

Cruz, A. M., Barr, C. & Puñales-Pozo, E. (2008). Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time . Revista de Salud Pública, 10(5), 808–817. https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736

ACM

[1]
Cruz, A.M., Barr, C. y Puñales-Pozo, E. 2008. Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time . Revista de Salud Pública. 10, 5 (nov. 2008), 808–817.

ACS

(1)
Cruz, A. M.; Barr, C.; Puñales-Pozo, E. Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time . Rev. salud pública 2008, 10, 808-817.

ABNT

CRUZ, A. M.; BARR, C.; PUÑALES-POZO, E. Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time . Revista de Salud Pública, [S. l.], v. 10, n. 5, p. 808–817, 2008. Disponível em: https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736. Acesso em: 28 dic. 2025.

Chicago

Cruz, Antonio M., Cameron Barr, y Elsa Puñales-Pozo. 2008. «Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time ». Revista De Salud Pública 10 (5):808-17. https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736.

Harvard

Cruz, A. M., Barr, C. y Puñales-Pozo, E. (2008) «Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time », Revista de Salud Pública, 10(5), pp. 808–817. Disponible en: https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736 (Accedido: 28 diciembre 2025).

IEEE

[1]
A. M. Cruz, C. Barr, y E. Puñales-Pozo, «Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time », Rev. salud pública, vol. 10, n.º 5, pp. 808–817, nov. 2008.

MLA

Cruz, A. M., C. Barr, y E. Puñales-Pozo. «Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time ». Revista de Salud Pública, vol. 10, n.º 5, noviembre de 2008, pp. 808-17, https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736.

Turabian

Cruz, Antonio M., Cameron Barr, y Elsa Puñales-Pozo. «Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time ». Revista de Salud Pública 10, no. 5 (noviembre 1, 2008): 808–817. Accedido diciembre 28, 2025. https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736.

Vancouver

1.
Cruz AM, Barr C, Puñales-Pozo E. Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time . Rev. salud pública [Internet]. 1 de noviembre de 2008 [citado 28 de diciembre de 2025];10(5):808-17. Disponible en: https://revistas.unal.edu.co/index.php/revsaludpublica/article/view/96736

Descargar cita

Visitas a la página del resumen del artículo

58

Descargas

Los datos de descargas todavía no están disponibles.