Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning

Consideración de la dilución operativa incorporando incertidumbres geológicas en la planificación minera a corto plazo

DOI:

https://doi.org/10.15446/dyna.v87n213.83661

Palabras clave:

operational dilution, short-term planning, uncertainties (en)
dilución operativa, planificación corto plazo, incertidumbres (es)

Autores/as

Operational dilution in open-pit mining can influence short-term mine planning and affect the adherence between designed and executed plans, impacting the reconciliation results. This type of dilution may occur due to several reasons, such as erroneous assumptions regarding contacts, inefficient mining performance, and uncertainties associated with the planned grades. The use of uncertainties enables better predictability and achievement of planned targets. Using the mine planning polygons and grade models, a methodology is proposed to measure the dilution ranges in each region. The methodology considers the uncertainty associated with the ore grades to verify the probability of occurrence of dilution in the short-term mine plan. The results demonstrated that the use of uncertainties enabled identification of the areas with a higher potential of incurring operational dilution. Using this information, the plans can be adjusted to minimize dilution, or the result can be used as a factor to correct the planned data.
La dilución operativa en la minería en rajo puede afectar la adherencia entre los planes diseñados y ejecutados, lo que afecta los resultados de la reconciliación. Este tipo de dilución puede ocurrir debido a suposiciones erróneas con respecto a los contactos, desempeño minero ineficiente e incertidumbres asociadas con las leyes planificadas. Utilizando los polígonos de planificación y los modelos de bloques, se propone una metodología para medir los rangos de dilución en cada región. La metodología considera la incertidumbre asociada con las leyes de mineral para verificar la probabilidad de ocurrencia de dilución en el plan de mina a corto plazo. Los resultados demostraron que el uso de incertidumbres permitió la identificación de las áreas con un mayor potencial de incurrir en una dilución operativa. Con esta información, los planes pueden ajustarse para minimizar la dilución, o el resultado puede usarse como un factor para corregir los datos planificados.

Referencias

Blom, M., Pearce, A.R. and Stuckey, P.J., Short-term planning for open pit mines: a review, International Journal of Mining, Reclamation and Environment. 33(5), pp. 318-339, 2019. DOI: 10.1080/17480930.2018.1448248.

Dimitrakopoulos, R., Farrelly, C.T. and Godoy, M., Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design, Mining Technology, 111(1), pp. 82-88, 2002. DOI: 10.1179/mnt.2002.111.1.82.

Dimitrakopoulos, R., Strategic mine planning under uncertainty, Journal of Mining Science, 47(2), pp. 138-150, 2011. DOI: 10.1134/S1062739147020018.

Lerchs, H. and Grossmann, I., Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, LXVIII, pp. 17-24, 1965.

Hochbaum, D., A new-old algorithm for minimum cut in closure graphs. Networks, 37(4), Anniversary Issue 2001, pp. 171-193, 2001. DOI: 10.1002/net.1012

Johnson, T., Optimum open pit mine production scheduling. In: Weiss, A. ed., A decade of digital computing in the mining industry, chapter 4. American Institute of Mining Engineers, New York, USA, 1969.

Torres, V.F.N. et al., Classical and stochastic mine planning techniques, state of the art and trends, REM - International Engineering Journal, 71(2), pp. 289-297, 2018. DOI: 10.1590/0370-44672016710165.

Birge, J.R. and Louveaux, F., Introduction to stochastic programming. Springer Science & Business Media. 2011.

Dare-Bryan, P.C. and Dowd, P.A., Assessing ore loss and ore dilution — Quantifying the effects of geological and technical uncertainties, in PACRIM 2004, pp. 19-22, 2004.

Spleit, M., Stochastic long-term production scheduling of the LabMag iron ore deposit in labrador, Canada. MSc. Thesis. Mc Gill University, Montreal, Canada, 2014.

Zarshenas, Y. and Saeedi, G., Risk assessment of dilution in open pit mines, Arabian Journal of Geosciences, 9(209), pp. 1-11, 2016. DOI: 10.1007/s12517-015-2214-8.

Matthews, T., Dilution and ore loss projections: strategies and considerations, in SME Annual Meeting. Denver, Colorado, pp. 1-4, 2015.

Xingwana, L., Monitoring ore loss and dilution for mine-to-mill integration in deep gold mines: a survey-based investigation, Journal of the Southern African Institute of Mining and Metallurgy, 116(2), pp. 149-160, 2016. DOI: 10.17159/2411-9717/2016/v116n2a6.

Ebrahimi, A., The importance of dilution factor for open pit mining projects. [online]. 2013. Available at: http://www.srk.com.au/files/File/papers/dilution_factor_openpit_a_ebrahimi.pdf.

Câmara, T.R., Sistematização do cálculo de diluição e perdas operacionais para reconciliação de teores e massas em lavra a céu aberto. McS. Thesis. Mining Engineering Department, Federal University of Rio Grande do Sul, Porto Alegre, Brasil, 2013.

Câmara, T.R. et al., Controlling Operational Dilution in Open-Pit Mining, Mining Technology, 128(1), pp. 1-8, 2018. DOI: 10.1080/25726668.2018.1470275.

Rossi, M.E., Accounting for dilution in ore resource estimation, in APCOM 2009. Vancouver, Canada, 2009, pp. 84-92.

Bertinshaw, R. and Lipton, I., Estimating mining factors (dilution and ore loss), in: Open Pit Mines, Large Open Pit Mining Conference, (September), 2007, pp. 13-17.

Roldão, D. et al., Combined use of lithological and grade simulations for risk analysis in iron ore, Brazil, in Geostatistics Oslo 2012, 2012, pp. 423-434. DOI: 10.1007/978-94-007-4153-9

Câmara, T.R. and Peroni, R. de L., Quantifying dilution caused by execution efficiency. REM: Int. Eng. J., 69(4), pp. 487-490, 2016. DOI: 10.1590/0370-44672014690006.

Crawford, G.D., Dilution and ore recovery. Pincock Perspectives, Issue 60, pp. 487-490, 2004.

Cómo citar

IEEE

[1]
T. R. Camara, R. Scheffer Leal, y R. de Lemos Peroni, «Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning», DYNA, vol. 87, n.º 213, pp. 178–183, abr. 2020.

ACM

[1]
Camara, T.R., Scheffer Leal, R. y de Lemos Peroni, R. 2020. Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning. DYNA. 87, 213 (abr. 2020), 178–183. DOI:https://doi.org/10.15446/dyna.v87n213.83661.

ACS

(1)
Camara, T. R.; Scheffer Leal, R.; de Lemos Peroni, R. Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning. DYNA 2020, 87, 178-183.

APA

Camara, T. R., Scheffer Leal, R. & de Lemos Peroni, R. (2020). Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning. DYNA, 87(213), 178–183. https://doi.org/10.15446/dyna.v87n213.83661

ABNT

CAMARA, T. R.; SCHEFFER LEAL, R.; DE LEMOS PERONI, R. Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning. DYNA, [S. l.], v. 87, n. 213, p. 178–183, 2020. DOI: 10.15446/dyna.v87n213.83661. Disponível em: https://revistas.unal.edu.co/index.php/dyna/article/view/83661. Acesso em: 22 mar. 2026.

Chicago

Camara, Tais Renata, Ronald Scheffer Leal, y Rodrigo de Lemos Peroni. 2020. «Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning». DYNA 87 (213):178-83. https://doi.org/10.15446/dyna.v87n213.83661.

Harvard

Camara, T. R., Scheffer Leal, R. y de Lemos Peroni, R. (2020) «Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning», DYNA, 87(213), pp. 178–183. doi: 10.15446/dyna.v87n213.83661.

MLA

Camara, T. R., R. Scheffer Leal, y R. de Lemos Peroni. «Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning». DYNA, vol. 87, n.º 213, abril de 2020, pp. 178-83, doi:10.15446/dyna.v87n213.83661.

Turabian

Camara, Tais Renata, Ronald Scheffer Leal, y Rodrigo de Lemos Peroni. «Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning». DYNA 87, no. 213 (abril 1, 2020): 178–183. Accedido marzo 22, 2026. https://revistas.unal.edu.co/index.php/dyna/article/view/83661.

Vancouver

1.
Camara TR, Scheffer Leal R, de Lemos Peroni R. Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning. DYNA [Internet]. 1 de abril de 2020 [citado 22 de marzo de 2026];87(213):178-83. Disponible en: https://revistas.unal.edu.co/index.php/dyna/article/view/83661

Descargar cita

CrossRef Cited-by

CrossRef citations5

1. Gonzalo Nelis, Nelson Morales, Rodrigo Estay, Fabián Manríquez, Patricio Vivar, Constanza Morales. (2025). A novel optimization model for the dig-limit definition problem in open pit mines with multiple destinations. Resources Policy, 102, p.105510. https://doi.org/10.1016/j.resourpol.2025.105510.

2. Jiaqi Jin, Chicheng Yan, Yixuan Tang, Yilong Yin, Zhihan Lv. (2021). [Retracted] Mine Geological Environment Monitoring and Risk Assessment in Arid and Semiarid Areas. Complexity, 2021(1) https://doi.org/10.1155/2021/3896130.

3. Rodrigo Alfaro, Mohammad Maleki, Nasser Madani, Saeed Soltani-Mohammadi. (2023). Comparing the accuracy of two approaches to account for internal dilution: A case study from a porphyry copper deposit. International Journal of Mining, Reclamation and Environment, 37(6), p.441. https://doi.org/10.1080/17480930.2023.2192030.

4. Mikhail Marinin, Oksana Marinina, Radosław Wolniak. (2021). Assessing of Losses and Dilution Impact on the Cost Chain: Case Study of Gold Ore Deposits. Sustainability, 13(7), p.3830. https://doi.org/10.3390/su13073830.

5. Eutemio Sánchez. (2023). Planeamiento estratégico para la mejora de productividad y competitividad de la minería subterránea en el Perú. Gestionar: revista de empresa y gobierno, 3(2), p.50. https://doi.org/10.35622/j.rg.2023.02.005.

Dimensions

PlumX

Visitas a la página del resumen del artículo

735

Descargas

Los datos de descargas todavía no están disponibles.