This study seeks to increase the understanding of stopwatch time studies by determining standard cycle times for an underground mining
extraction process, implementing the technique in a polymetallic mining deposit of intermediate to low sulphidation of silver, gold, lead,
zinc, and copper, contained in silver-bearing galena, sphalerite, chalcopyrite, and tetrahedrite; located in veins, at a height of 4630 m above
sea level. The meticulous methodology of the technique identified and corrected an error in production cycle times, recognizing irregular
elements that had been ignored in previous measurements, as well as strange elements produced during drilling activities, which set pace
to the entire process. Finally, an improved and adapted technique was developed for this sector, through which process cycles could be
determined at a 7.3% error, an acceptable value due to access limitations to the extraction areas by the strict security measures and reduced bias in planning production projections.
El objetivo del estudio fue ampliar la comprensión del estudio de tiempos con cronómetro, en la determinación del tiempo de ciclo estándar de un proceso extractivo minero subterráneo, implementando la técnica en un yacimiento minero polimetálico de plata (Ag), oro (Au), plomo (Pb), zinc (Zn) y cobre (Cu), contenidos en galena argentífera, esfalerita, calcopirita y tetraedrita; de intermedia a baja sulfuración, emplazado en vetas, a una altura de 4 630 metros sobre el nivel del mar. La minuciosa metodología de la técnica permitió evidenciar y corregir un error en las unidades del tiempo de ciclo productivo, identificar elementos casuales que habían sido ignorados en mediciones previas, y elementos extraños producidos durante la labor de perforación, que fue la tarea estudiada por ser la que marca el ritmo del proceso. Finalmente, se logró una técnica mejorada y adaptada para este sector, a través del cual se pudo determinar el ciclo del proceso con un 7.3% de error, aceptable debido a las limitantes que constituyen el acceso a las zonas extractivas por las estrictas medidas de seguridad, y además disminuir el sesgo en la planificación de las proyecciones de producción.
Referencias
Definición de Estudio de Métodos o Ingeniería de Métodos, Ingeniería Industrial. Available at: https://www.ingenieriaindustrialonline.com/ingenieria-de-metodos/que-es-la-ingenieria-de-metodos/
Palacios, L. Ingeniería de métodos: movimientos y tiempos. Colombia: ECOE Ediciones, 2016.
Ovalle-Castiblanco, A.M. and Cárdenas, D.M. ¿Qué ha pasado con la aplicación del estudio de tiempos y movimientos en las últimas dos décadas?: Revisión de la literatura. Ingeniería Investigación y Desarrollo, 16 (2), pp. 12-31, 2016. https://doi.org/10.19053/1900771X.v16.n2.2016.5443
Baca, G., Cruz, M., Crstóbal, M., Baca-C, G., Gutiérrez, J., Pacheco, A., Rivera, A., Rivera, I. and Obregón, M. Introducción a la Ingeniería Industrial. México: Grupo Editorial Patria, 2014.
Cuatrecasas-Arbos, L., Fortuny-Santos, J. and Vintro-Sanchez, C. The Operations Time Chart: A graphical tool to evaluate the performance of production systems- From batch-and-queue to lean manufacturing. Computers & Industrial Engineering, 61, pp. 663-665, 2011. https://doi.org/10.1016/j.cie.2011.04.022
Rehman, A., Ramzan, M.B., Shafiq, M., Rasheed, A., Naeem, M.S. and Savino, M.M., Productivity Improvement Through Time Study Approach: A Case Study from an Apparel Manufacturing Industry of Pakistan, Proceedings of 25th International Conference on Production Research Manufacturing Innovation: Cyber Physical Manufacturing, pp. 1447-1454, 2019. https://doi.org/10.1016/j.promfg.2020.01.306
Wu, S., Wang, Y., BolaBola, J., Qin, H., Ding, W., Wen, W. and Niu, J. Incorporating motion analysis technology into modular arrangement of predetermined time standard (MODAPTS). International Journal of Industrial Ergonomics, 53, pp. 291-298, 2016. https://doi.org/10.1016/j.ergon.2016.03.001
Duran, C., Cetindere, A. and Aksu, Y.E., Productivity Improvement by Work and Time Study Technique for Earth Energy-glass Manufacturing Company, Proceedings of 4th World Conference on Business, Economics and Management, (WCBEM), pp. 109-113, 2015. https://doi.org/10.1016/S2212-5671(15)00887-4
Song, Z., Rinne, M. and Wageningen, A. A review of real-time optimization in underground mining production. The Journal of The Southem African Institute og Minig and Metallurgy, 113, pp. 889-897, 2013.
Ramírez, N. Sistema de Gestión del Tiempo en Operaciones Mineras. Lima: NR Ingenieros s.a.c., 2018.
Krot, P., Sliwinski, P., Zimroz, R. and Gomolla, N. The identification of operational cycles in the monitoring systems of underground vehicles. Measurement, 151, pp. 107-111, 2020. https://doi.org/10.1016/j.measurement.2019.107111
Jung J. and Choi, Y. Measuring Transport Time of Mine Equipment in an Underground Mine Using a Bluetooth Beacon System. Minerals, 7 (1), pp. 1-10, 2016. https://doi.org/10.3390/min7010001
Mine Types and Technology, Core Concepts, Mining Matters. Available at: https://miningmatters.ca/docs/default-source/mining-matters---ttsp-documents/core-concepts-mining-cycle.pdf?sfvrsn=a6f2b298_2
Improving efficiency underground: A challenge worth tackling. Viewpoint Mining Magazine, Caterpillar. Available at: http://viewpointmining.com/article/improving-efficiency-underground
Ranjith, P.G., Zhao, J., Ju, M., De Silva, R.V.S., Rathnaweera, T.D. and Bandara, A.K.M.S. Opportunities and Challenges in Deep Mining: A Brief Review. Engineering, 3 (4), pp. 546-551, 2017. https://doi.org/10.1016/J.ENG.2017.04.024
García, R. Estudio del trabajo. México: McGrawHill, 2005.
Spare Parts Classification for 3D Printing Suitability, Jonkoping University. Available at: http://hj.diva-portal.org/smash/get/diva2:1105503/FULLTEXT01.pdf
Vishnu, C.R. and Regikumar, V., Reliability Based Maintenance Strategy Selection in Process Plants: A Case Study, Proceedings of 1st Global Colloquium on Recent Advancements and Effectual Researches in Engineering, Science and Technology (RAEREST), pp. 1080-1087, 2016. https://doi.org/10.1016/j.protcy.2016.08.211
Cómo citar
IEEE
ACM
ACS
APA
ABNT
Chicago
Harvard
MLA
Turabian
Vancouver
Descargar cita
CrossRef Cited-by
1. František Koblasa, Maria Urban. (2026). Time prediction methods in production − a scoping review of the 21st century so far. Computers & Industrial Engineering, 213, p.111713. https://doi.org/10.1016/j.cie.2025.111713.
Dimensions
PlumX
Visitas a la página del resumen del artículo
Descargas
Licencia

Esta obra está bajo una licencia internacional Creative Commons Atribución-NoComercial-SinDerivadas 4.0.
El autor o autores de un artículo aceptado para publicación en cualquiera de las revistas editadas por la facultad de Minas cederán la totalidad de los derechos patrimoniales a la Universidad Nacional de Colombia de manera gratuita, dentro de los cuáles se incluyen: el derecho a editar, publicar, reproducir y distribuir tanto en medios impresos como digitales, además de incluir en artículo en índices internacionales y/o bases de datos, de igual manera, se faculta a la editorial para utilizar las imágenes, tablas y/o cualquier material gráfico presentado en el artículo para el diseño de carátulas o posters de la misma revista.