PRODUCTION SCHEDULING WITH SEQUENCE-DEPENDENT SETUPS AND JOB RELEASE TIMES

Palabras clave:

Scheduling, sequence-dependent setup times, release dates, randomness, heuristic. (es)

Descargas

Autores/as

  • JAIRO R. MONTOYA-TORRES Universidad de La Sabana, Chía, Colombia
  • MILTON SOTO-FERRARI Universidad del Norte, Barranquilla, Colombia
  • FERNANDO GONZÁLEZ-SOLANO Universidad del Norte, Barranquilla, Colombia
This paper studies a shortterm production scheduling problem inspired from reallife manufacturing systems consisting on the scheduling a set of jobs (production orders) on both a single machine and identical parallel machines with the objective of minimizing the makespan or maximum completion time of all jobs. Jobs are subject to release dates and there are sequence-dependent machine setup times. Since this problem is known to be strongly NP-hard even for the single machine case, this paper proposes a heuristic algorithm to solve it. The algorithm uses a strategy of random generation of various execution sequences, and then selects the best of such schedules. Experiments are performed using random-generated data and show that the heuristic performs very well compared against the optimal solution and lower bounds, and requiring short computational time.

Visitas a la página del resumen del artículo

349

Descargas

Los datos de descarga aún no están disponibles.

Cómo citar

[1]
“PRODUCTION SCHEDULING WITH SEQUENCE-DEPENDENT SETUPS AND JOB RELEASE TIMES”, DYNA, vol. 77, no. 163, pp. 260–269, Jul. 2010, Accessed: Sep. 02, 2026. [Online]. Available: https://revistas.unal.edu.co/index.php/dyna/article/view/25558