Live working methodologies and procedures, transient analysis for live line working procedures, Potential Transformers (PT), Capacitive Coupling Voltage Transformer (CCVT) (es)
The present document describes the results reached by the analysis about the procedures to disconnect and connect CCVTs with LLW technics. Additionally, the document describes the application of these results in maintenance activities on San Bernardino 230kV and Caño Limón 230kV substations. The first one was realized to make electrical diagnostics tests on Busbar’s CCVTs without turn off the substation. The second one was realized to replace a CCVT in one pole of Banadía-Caño Limón’s overhead line bay.
Visitas a la página del resumen del artículo
430
Descargas
Los datos de descarga aún no están disponibles.
Cómo citar
SANIN RINCON, I. A. (2011). Disconnection and Connection of CCVTs Applying Live Line Working Methodology. Simposio Internacional Sobre La Calidad De La Energía Eléctrica - SICEL, 6. https://revistas.unal.edu.co/index.php/SICEL/article/view/21884