Publicado

2013-01-01

Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems

Palabras clave:

Multilevel Inverters, Tolerance to faults, IPDPWM Modulation, NPC inverters, CHB inverters. (es)

Descargas

Autores/as

  • Oscar Julian Peña Huaringa autor

Industry and mining sectors use large engines

driven by variable speed drives, which greatest fault rate is

presented in multilevel inverter stage. This article shows

operating strategies in tolerance to faults multilevel inverters,

focusing on the reconfiguration of the modulation of trigger

signals, in order to ensure continuity of service without affecting

the operation of the motor.

We present the strategy for NPC (Neutral Point Clamped)

multilevel inverters of three levels and CHB (Cascaded H Bridge)

of seven levels, simulating its action on an electric mining system,

modeled in PSCAD / EMTDC software.

Cómo citar

APA

Peña Huaringa, O. J. (2013). Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems. Simposio Internacional sobre la Calidad de la Energía Eléctrica - SICEL, 7. https://revistas.unal.edu.co/index.php/SICEL/article/view/38832

ACM

[1]
Peña Huaringa, O.J. 2013. Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems. Simposio Internacional sobre la Calidad de la Energía Eléctrica - SICEL. 7, (ene. 2013).

ACS

(1)
Peña Huaringa, O. J. Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems. SICEL 2013, 7.

ABNT

PEÑA HUARINGA, O. J. Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems. Simposio Internacional sobre la Calidad de la Energía Eléctrica - SICEL, [S. l.], v. 7, 2013. Disponível em: https://revistas.unal.edu.co/index.php/SICEL/article/view/38832. Acesso em: 14 feb. 2025.

Chicago

Peña Huaringa, Oscar Julian. 2013. «Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems». Simposio Internacional Sobre La Calidad De La Energía Eléctrica - SICEL 7 (enero). https://revistas.unal.edu.co/index.php/SICEL/article/view/38832.

Harvard

Peña Huaringa, O. J. (2013) «Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems», Simposio Internacional sobre la Calidad de la Energía Eléctrica - SICEL, 7. Disponible en: https://revistas.unal.edu.co/index.php/SICEL/article/view/38832 (Accedido: 14 febrero 2025).

IEEE

[1]
O. J. Peña Huaringa, «Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems», SICEL, vol. 7, ene. 2013.

MLA

Peña Huaringa, O. J. «Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems». Simposio Internacional sobre la Calidad de la Energía Eléctrica - SICEL, vol. 7, enero de 2013, https://revistas.unal.edu.co/index.php/SICEL/article/view/38832.

Turabian

Peña Huaringa, Oscar Julian. «Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems». Simposio Internacional sobre la Calidad de la Energía Eléctrica - SICEL 7 (enero 1, 2013). Accedido febrero 14, 2025. https://revistas.unal.edu.co/index.php/SICEL/article/view/38832.

Vancouver

1.
Peña Huaringa OJ. Operation Strategies with Tolerance to Faults in Multilevel Inverters to Ensure Continuity Process in Industrial Industrial and Mining Systems. SICEL [Internet]. 1 de enero de 2013 [citado 14 de febrero de 2025];7. Disponible en: https://revistas.unal.edu.co/index.php/SICEL/article/view/38832

Descargar cita

Visitas a la página del resumen del artículo

164

Descargas

Los datos de descargas todavía no están disponibles.